Objectif A high temperature metallic filter has recently been developed. A pilot unit using this new filter will be installed on a full-size sinter plant to evaluate the filter in an industrial application. Other partners in the project will evaluate various filter materials as well as the implications of the metallic filter on recycling dusts collected and on the possibility of improving sinter strand operations to minimise the generation of corrosive and polluting components in the gas stream. Programme(s) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Thème(s) B - Reduction of iron ores Appel à propositions Data not available Régime de financement CSC - Cost-sharing contracts Coordinateur British Steel plc Contribution de l’UE Aucune donnée Adresse Moorgate S60 3AR Rotherham Royaume-Uni Voir sur la carte Coût total Aucune donnée Participants (3) Trier par ordre alphabétique Trier par contribution de l’UE Tout développer Tout réduire CENTRO NACIONAL DE INVESTIGACIONES METALURGICAS Espagne Contribution de l’UE Aucune donnée Adresse Avenida Gregorio del Amo 8 28040 MADRID Voir sur la carte Coût total Aucune donnée CSI-PLANOS Espagne Contribution de l’UE Aucune donnée Adresse 33400 AVILES Voir sur la carte Coût total Aucune donnée INSTITUTO DE SOLDADURA E QUALIDADE Portugal Contribution de l’UE Aucune donnée Adresse Estrada Nacional 249 - Km 3 Cabanas - Leiao (TagusPark) 2781 OEIRAS CODEX Voir sur la carte Coût total Aucune donnée