Skip to main content
European Commission logo print header

Design of the ITER Steady State Electrical Power Network - definition of the site specific design criteria for Cadarache - design of the electrical distribution sysem inside the ITER Tokamak building for the European Sites

Appel à propositions

Data not available

Régime de financement

CSC - Cost-sharing contracts

Coordinateur

ITALIAN AGENCY FOR NEW TECHNOLOGY, ENERGY AND THE ENVIRONMENT
Contribution de l’UE
Aucune donnée
Adresse
LungoTevere Grande Ammiraglio Thaon Di Revel 76
00196 ROMA
Italie

Voir sur la carte

Coût total
Aucune donnée