Feasibility-study of a continuously operating horizontal billet spray deposition plant

Objetivo

The ultimate aim of the partners in this project, the Danish Steelworks Ltd and Mannesmann Demag Hüttentechnik, is to build and operate a pilot plant for the manufacture of round steel billet in a horizontal and continuously operating spray deposition installation. The aim of this feasibility-study is to establish the engineering and metallurgical basis for the construction and the operation of a pilot scale plant. The basic technology is an European development and already exists as a batch operation with a 1.2 ton capacity. The challenge to further progress is to scale-up the operation to 5 to 10 tons operating continuously.

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

DET DANSKE STÅLVALSEVÆRK
Aportación de la UE
Sin datos
Dirección

3300 FREDERIKSVÆRK
Dinamarca

Ver en el mapa

Coste total
Sin datos

Participantes (1)