Skip to main content
European Commission logo print header
Contenuto archiviato il 2022-11-21

Feasibility-study of a continuously operating horizontal billet spray deposition plant

Obiettivo

The ultimate aim of the partners in this project, the Danish Steelworks Ltd and Mannesmann Demag Hüttentechnik, is to build and operate a pilot plant for the manufacture of round steel billet in a horizontal and continuously operating spray deposition installation. The aim of this feasibility-study is to establish the engineering and metallurgical basis for the construction and the operation of a pilot scale plant. The basic technology is an European development and already exists as a batch operation with a 1.2 ton capacity. The challenge to further progress is to scale-up the operation to 5 to 10 tons operating continuously.

Invito a presentare proposte

Data not available

Meccanismo di finanziamento

DEM - Demonstration contracts

Coordinatore

DET DANSKE STÅLVALSEVÆRK
Contributo UE
Nessun dato
Indirizzo

3300 FREDERIKSVÆRK
Danimarca

Mostra sulla mappa

Costo totale
Nessun dato

Partecipanti (1)