Objectif In this project methods of improving energy process control in the operation of arc furnaces will be developed. During melting the arc output will be set to the highest possible value. Where scrap melting is uneven, the arc output will be set to non-symmetrical values. It will also be investigated whether the height of foam slag can be monitoring by arc reactances calculated by the measuring system. The research and development work will be carried out in several electric melting shops. The expected results is a reduction in specific energy consumption for electric steel production. Programme(s) ECSC-STEELRES 7C - Medium-term guidelines (ECSC) "technical steel research", 1986-1990 Thème(s) C1 - Primary steelmaking Appel à propositions Data not available Régime de financement CSC - Cost-sharing contracts Coordinateur Verein Deutscher Eisenhüttenleute eV Contribution de l’UE Aucune donnée Adresse Sohnstraße 65 40237 Düsseldorf Allemagne Voir sur la carte Coût total Aucune donnée