Objective This plant intends to develop methods of applying continuous casting techniques for large blooms at near liquidus temperatures already investigated in research projects 7215- CA/807 and 7210-CA/215. These techniques will be perfected on steels with carbon contents of 0.2 to 0.8% and for rates up to 1 tonne/minute/line. Industrial testing will be carried out at Scunthorpe: blooms with stopper tundish opening, and at Teesside: blooms with sliding gate tundish opening. Programme(s) ECSC-STEELDEM 3C - Medium-term guidelines (ECSC) for the programmes of technical steel research and of steel pilot/demonstration projects, 1991-1995 Topic(s) T2 - Continuous casting Call for proposal Data not available Funding Scheme CSC - Cost-sharing contracts Coordinator British Steel plc EU contribution No data Address TS6 6UB Middlesbrough United Kingdom See on map Total cost No data