Objetivo This plant intends to develop methods of applying continuous casting techniques for large blooms at near liquidus temperatures already investigated in research projects 7215- CA/807 and 7210-CA/215. These techniques will be perfected on steels with carbon contents of 0.2 to 0.8% and for rates up to 1 tonne/minute/line. Industrial testing will be carried out at Scunthorpe: blooms with stopper tundish opening, and at Teesside: blooms with sliding gate tundish opening. Programa(s) ECSC-STEELDEM 3C - Medium-term guidelines (ECSC) for the programmes of technical steel research and of steel pilot/demonstration projects, 1991-1995 Tema(s) T2 - Continuous casting Convocatoria de propuestas Data not available Régimen de financiación CSC - Cost-sharing contracts Coordinador British Steel plc Aportación de la UE Sin datos Dirección TS6 6UB Middlesbrough Reino Unido Ver en el mapa Coste total Sin datos