Skip to main content
European Commission logo print header

Solar Up-scale Gas Turbine System

Ziel

The SOLUGAS project consists in the demonstration of a solar-hybrid power system with direct solar heating of a gas turbine’s pressurized air. In combination with highly efficient combined cycle systems or in cogeneration applications significant cost reductions for solar electric power generation can be achieved. The demonstration project will be the first commercial-scale system that can later be offered to customers in several configurations (combined cycle, cogeneration, etc). The project will prove the technological feasibility, performance and cost reduction potential of such power plants. A complete solar-hybrid gas turbine demonstration system will be designed and erected in the project. Major new developments include a tube receiver and a solar-adapted commercial gas turbine. The solar concentrator field and tower are laid out and built. Software tools will be used and extended to allow simulation of the components and system performance. The tools will be verified by comparing performance predictions with measured data. Later the tools will be applied to allow predictions for other commercial systems. This project will reduce the water consumption of CSP power plants and land usage by increasing the efficiency, this will reduce the investment and O&M costs and improve the enviromental profile of CSP power plants. This kind of improvements are necessary to make CSP systems more competitive with conventional electricity sources and other renewable

Schlüsselbegriffe

Aufforderung zur Vorschlagseinreichung

FP7-ENERGY-2007-2-TREN
Andere Projekte für diesen Aufruf anzeigen

Koordinator

ABENGOA SOLAR NEW TECHNOLOGIES SA
EU-Beitrag
Keine Daten
Adresse
CALLE ENERGIA SOLAR CAMPUS PALMAS ALTAS 1
41014 SEVILLA
Spanien

Auf der Karte ansehen

Region
Sur Andalucía Sevilla
Aktivitätstyp
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Kontakt Verwaltung
Roman Korzynietz (Mr.)
Links
Gesamtkosten
Keine Daten