ID: BM./00012/97
The aim is to demonstrate a high efficient fluidised bed boiler, firing straw (130.000 t/yr), that is not subject to sintering and fouling. The 25 MWe and > 7 MWth CHP plant will be built in Pamplona (Spain). The innovative aspects are a water cooled air distributor, allowing ...
Programme: FP4-NNE-THERMIE C
Record Number: 45104
Last updated on: 1998-08-04
ID: BM./00188/96
Anfangsdatum: 1996-09-01, Enddatum: 1998-11-01
The aim of the project is the implementation of a demonstration power plant of the capacity of 10 MWe to be fed with agro-forestry residues, woody products and straw, as well as dedicated energy crops, to be built in a rural area of Central Italy (Umbria), using an innovative ...
Programme: FP4-NNE-THERMIE C
Record Number: 45112
Last updated on: 1998-08-04
ID: BM./00248/97
The aim of the project is to demonstrate the economic and technical viability of the production of electricity via the gasification of Refuse Derived Fuel (RDF). A 3.5 MWe power station was built by the municipalities in the Chianti region to be fuelled by RDF produced locally...
Programme: FP4-NNE-THERMIE C
Record Number: 45114
Last updated on: 1998-08-04
ID: BM./00104/96
The aim is to replace the use of fossil fuel currently used to produce hot gases and electricity for industrial processing with a combination of Refuse Derived Fuel and waste fossil fuel to reduce operating costs of plant. To install 2 gasifiers for RDF/coal mixtures and a boi...
Programme: FP4-NNE-THERMIE C
Record Number: 45109
Last updated on: 1998-08-04
ID: BM./00180/97
Bubbling Fluidised Bed Combustion of 120.000 ton/yr of poultry litter based on the Kvaerner Pulping process producing 9,6 MWe during 8000 hours per year (electrical efficiency 23 %). Limestone is injected in the furnace to remove acid gases and activated carbon for dioxins and...
Programme: FP4-NNE-THERMIE C
Record Number: 45110
Last updated on: 1999-10-21
ID: BM./00008/97
The aim is to construct a CHP 5 MWe plant using 35,000 t/y sewage sludge as a fuel. The process is based on atmospheric pyrolytic gasification, at > 850 deg. C followed by gas cleaning (including active carbon filter for Hg removal) and fuel gas combustion in a 4.5 MWe gas tur...
Programme: FP4-NNE-THERMIE C
Record Number: 45103
Last updated on: 1999-10-22
ID: BM./00123/98
Anfangsdatum: 1998-11-01, Enddatum: 2001-12-31
To design, construct and operate a 27 MWe net RDF gasification plant for the energetic utilisation of the RDF produced by two MSW recycling plants. The project also aims to demonstrate the technical and economic viability of the TPS circulating fluidized bed gasification techn...
Programme: FP4-NNE-THERMIE C
Record Number: 51090
Last updated on: 2002-10-21
ID: BM./00036/97
Anfangsdatum: 1998-02-01, Enddatum: 2001-05-31
The proposed study aims at installing a power station to produce 5 MWe of electricity utilising the biomass waste obtained from the annual cleaning of the forestry areas. In addition, up to 15% of non-toxic MSW will be added because there is too much excess in this zone for wh...
Programme: FP4-NNE-THERMIE C
Record Number: 51087
Last updated on: 2002-10-21
ID: BM./00185/95
Anfangsdatum: 1995-09-01, Enddatum: 1997-10-31
To define construction operating parameters for optimizing exhausted olive husk (30%) and trimming waste (30%) combustion for electricity (10.5 MWe) and heat (15 MWth) production (20T/H steam at 15 Bar). Two stage combustion unit provided with double biomass feeding system, de...
Programme: FP4-NNE-THERMIE C
Record Number: 45111
Last updated on: 1999-10-21
ID: SF./00102/96
Anfangsdatum: 1996-01-01, Enddatum: 1997-07-01
AIM IS TO DEMONSTATE SOLID FUEL CHP WITH DISTRICT HEATING BY REPLACING HOT WATER BOILER WITH SMALL MULTI-FUEL HP STEAM BOILER AND EMPLOY A BACK PRESSURE TURBINE. THE PROJECT IS BASED ON GASIFYING BIOMASS FUELS IN AN EXISTING DESIGN OF GASIFIER [DEVELOPED IN EU STEP-CT 91-0129]...
Programme: FP4-NNE-THERMIE C
Record Number: 45276