Research and Development in support of the GEMINI Initiative
ID: 755478
Start date: 2017-09-01, End date: 2020-08-31
GEMINI+ project proposal will be submitted to the European Commission addressing the 2016 Euratom call for proposals (deadline October 5th, 2016).GEMINI+ project will provide a conceptual design for a high temperature nuclear cogeneration system for supply of process steam to...
Programme: H2020-Euratom-1.1.
Record Number: 211038
Last updated on: 2017-07-31
High-Performance Monte Carlo Methods for SAFEty Demonstration- From Proof of Concept to realistic Safety Analysis and Industry-like Applications
ID: 755097
Start date: 2017-09-01, End date: 2020-08-31
Considering the priority topics of NUGENIA and the achievements of the EU HPMC project, the overall objective of the McSAFE project is to move the Monte Carlo based stand-alone and coupled solution methodologies (advanced depletion, optimal coupling of MC-codes to...
Programme: H2020-Euratom-1.1.
Record Number: 211032
Last updated on: 2017-06-29
New Approach to Reactor Safety ImprovementS
ID: 755439
Start date: 2017-09-01, End date: 2021-08-31
Probabilistic Safety Assessment (PSA) procedures allow to better understand and estimate the likelihood of the most causes prone to initiate nuclear accidents and to identify the most critical elements of the systems. However, despite of the remarkable reliability of current...
Programme: H2020-Euratom-1.1.
Record Number: 210836
Last updated on: 2017-08-17
European Tools and Methodologies for an efficient ageing management of nuclear power plant Cables
ID: 755183
Start date: 2017-09-01, End date: 2022-02-28
The lifetime of existing NPPs can potentially be extended to between 60 and 80 years if safety and operability of facilities can be guaranteed. With an average of 25 000 cables for a total length of 1 500 km per nuclear power plant (NPP) unit, all organisations involved in the...
Programme: H2020-Euratom-1.1.
Record Number: 210832
Last updated on: 2017-06-29
FAST Nuclear Emergency Tools (FASTNET)
ID: 662284
Start date: 2015-10-01, End date: 2019-09-30
When dealing with emergency, two issues with fully different time requirements and operational objectives, and thus different methods and tools, have to be considered: emergency preparedness and emergency response. This project will address both issues by combining the efforts...
Programme: H2020-Euratom-1.8.
Record Number: 198668
Last updated on: 2017-08-17
Advanced Structural Integrity Assessment Tools for Safe Long Term Operation
ID: 754589
Start date: 2017-06-01, End date: 2021-05-31
NFRP 1: 2016-2017 notes that “A number of current Generation II reactors should continue operating for a few decades and Generation III should still be in operation one century from now.” This requires a systematic ageing management procedure for justifying their safe long...
Programme: H2020-Euratom-1.1.
Record Number: 210827
Last updated on: 2017-08-17
INcreasing Safety in NPPs by Covering gaps in Environmental Fatigue Assessment
ID: 662320
Start date: 2015-07-01, End date: 2020-06-30
INCEFA-PLUS delivers new experimental data and new guidelines for assessment of environmental fatigue damage to ensure safe operation of European nuclear power plants.Austenitic stainless steels will be tested for the effects of mean strain, hold time and material roughness on...
Programme: H2020-Euratom-1.8.
Record Number: 197289
Last updated on: 2017-06-29
Safe long term operation of light water reactors based on improved understanding of radiation effects in nuclear structural materials
ID: 661913
Start date: 2015-09-01, End date: 2019-08-31
The overall aim of the SOTERIA project is to improve the understanding of the ageing phenomena occurring in reactor pressure vessel (RPV) steels and in the internal steels (internals) in order to provide crucial information to regulators and operators to ensure safe long-term...
Programme: H2020-Euratom-1.8.
Record Number: 196910
Last updated on: 2017-07-28
Nondestructive Evaluation (NDE) System for the Inspection of Operation-Induced Material Degradation in Nuclear Power Plants
ID: 755330
Start date: 2017-06-01, End date: 2021-05-31
The long-term operation (LTO) of existing nuclear power plants (NPPs) has already been accepted in many countries as a strategic objective to ensure adequate supply of electricity over the coming decades. In order to estimate the remaining useful lifetime of NPP components...
Programme: H2020-Euratom-1.1.
Record Number: 210834
Last updated on: 2017-05-23
In-Vessel Melt Retention Severe Accident Management Strategy for Existing and Future NPPs
ID: 662157
Start date: 2015-06-01, End date: 2019-05-31
The stabilization of molten corium is recognised as essential if a safe and stable state is to be reached following a severe accident. Among the possible options, In-Vessel Melt Retention (IVMR) appears as an attractive solution that would minimize the risks of containment...
Programme: H2020-Euratom-1.8.
Record Number: 196923
Last updated on: 2017-07-24
12 > 
List retrieved on: 2018-05-22
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top