Community Research and Development Information Service - CORDIS

Horizon 2020 project information and now also report summaries are available on CORDIS. All H2020 projects can be downloaded from the EU Open Data Portal .

My refinements


Download results of this page


Refine by:

Content type

Project (629)

Country

Belgium (16)
Denmark (26)
France (125)
Germany (74)
Greece (33)
Ireland (31)
Italy (92)
Luxembourg (3)
Netherlands (70)
Portugal (18)
Spain (74)
United Kingdom (67)

Advanced search

Search projects and results

Results 1 - 10 of 629
Results/page:
12 3 4 5 6 7 8 9 10 > >| 
ID: SE./00201/89
Start date: 1990-06-01, End date: 1993-08-31
A number of existing houses have been retrofitted with sunspaces and ventilation heat recovery (VHR) systems, with the ventilation air drawn via the sunspace. The principal aim of the project was to establish the potential energy benefit of using sunspaces for ventilation pre-...
Programme: ENG-ENDEMO C
Record Number: 16163
Last updated on: 1999-10-21
ID: BM./00037/88
Start date: 1989-04-01, End date: 1991-01-31
To construct a composting plant to produce 1690 t/y of compost from 3700 t/y of crushed slaughterhouse wastes and agricultural lignocellulosic wastes.
Programme: ENG-ENDEMO C
Record Number: 15710
Last updated on: 1999-10-21
ID: EE./00006/89
Start date: 1990-03-01, End date: 1992-02-29
Use of low temperature waste heat for additional preheating of the combustion air and for prevention of low temperature corrosion. This technique yields an increase of the plant availability and a longer life of the recuperator by preventing the temperature from falling below ...
Programme: ENG-ENDEMO C
Record Number: 15612
Last updated on: 1999-10-21
ID: BM./00438/87
Start date: 1988-04-01, End date: 1989-12-31
The project aims at demonstrating a reliable system, namely a fluidized bed, for the anaerobic treatment with energy production of low-strength wastewaters at high space loading rates.
Programme: ENG-ENDEMO C
Record Number: 15084
Last updated on: 1999-10-21
ID: BM./00132/86
Start date: 1987-10-01, End date: 1989-09-30
The aim of the project is to demonstrate the innovative satisfactory utilization of sludge beds to treat anaerobically low-strength urban waste waters at psychrophilic temperatures. The expected yearly energy-saving is 165 toe. The expected simple payback period is about 5 ye...
Programme: ENG-ENDEMO C
Record Number: 15063
Last updated on: 1999-10-21
ID: EE./00080/88
Start date: 1989-05-02, End date: 1993-12-01
Heat treatment installation for parts manufactured in spheroidal foundry to be replaced advantageously from traditional manufacturing processes, involving power savings and others such as reduction in production costs.
Programme: ENG-ENDEMO C
Record Number: 14557
Last updated on: 1999-10-21
ID: GE./00326/89
Start date: 1990-01-01, End date: 1992-10-01
Testing of a new type of pipes with no metallic part except at the surface and in the open hole section of the reservoir. Two twin pipes will be installed in the production well of Villeneuve St. Georges/Ile de France. At the surface one of the pipes will be fed by a high pres...
Programme: ENG-ENDEMO C
Record Number: 15851
Last updated on: 1999-10-21
ID: EE./00263/86
Start date: 1990-05-01, End date: 1998-10-31
The aim of the project is to save energy in the pyrometallurgical treatment of nickeliferrous Laterites, upgrading them by rejecting the contained in the mass of the ore free silica waste, using physical methods.
Programme: ENG-ENDEMO C
Record Number: 14639
Last updated on: 1999-10-21
ID: LG./00007/87
Start date: 1988-03-01, End date: 1989-02-28
Construction and operation of a demonstration plant with a capacity of 1,500 T/D raw brown coal using the Winkler process at high temperature (1,000 deg. C) and under pressure (10 Bar). The subjects of this new application are to increase productivity and also to prove the hig...
Programme: ENG-ENDEMO C
Record Number: 14820
Last updated on: 1999-10-21
ID: LG./00007/86
Start date: 1987-03-01, End date: 1988-02-29
Construction and operating of a demonstration plant with a capacity of 1,500 T/D of raw brown coal using the Winkler process at high temperature (1,000 deg. C) and under pressure (10 Bar). The subject of this contract is to increase productivity and to reduce the compression e...
Programme: ENG-ENDEMO C
Record Number: 14819
Last updated on: 1999-10-21
12 3 4 5 6 7 8 9 10 > >| 
List retrieved on: 2018-05-26
Follow us on: RSS Facebook Twitter YouTube Managed by the EU Publications Office Top