Servizio Comunitario di Informazione in materia di Ricerca e Sviluppo - CORDIS

Le informazioni sui progetti di Orizzonte 2020 e ora anche le relative sintesi delle relazioni sono disponibili su CORDIS. Tutti i progetti H2020 possono essere scaricati dal Portale Open Data dell'UE .

My refinements


Download results of this page


Perfeziona per:

Programma

FP5
Tutti
FP5-EESD (1)
FP5-GROWTH (20)

Advanced search

Cerca progetti e risultati

Results 1 - 10 of 21
Order by: Results/page:
12 3 > 
Safety and reliability of industrial products, systems and structures
ID: G1RT-CT-2001-05051
Data di inizio: 2001-11-01, Termine: 2006-02-28
The Thematic Network is concerned with providing safe and cost effective solutions to industrial products, systems, facilities and structures across different industries. The scope of the project is the integrated treatment of the important aspects of design, production, opera...
Programme: FP5-GROWTH
Record Number: 58625
Last updated on: 2006-06-13
Performance based building
[PROGETTO] PEBBU - Performance based building
ID: G1RT-CT-2001-05038
Data di inizio: 2001-10-01, Termine: 2005-10-31
Given the perspective of supply-oriented building specifications, codes and standards currently enforced in most countries inhibit building and construction trade. Performance Based Building (PeBBu) strives to overcome this problem and aims at enhancing consumer-orientation, c...
Programme: FP5-GROWTH
Record Number: 58624
Last updated on: 2006-06-13
Lifetime engineering of buildings and civil infrastructures
ID: G1RT-CT-2002-05082
Data di inizio: 2002-06-01, Termine: 2005-07-31
Organised and systematised database of Best Practice, Best Research Results and Advanced Implementation Activities of lifetime engineering. Recommendations for international and national standardisation, training and education. Generic model and description of lifetime enginee...
Programme: FP5-GROWTH
Record Number: 62914
Last updated on: 2005-12-09
Network on european sustainable minerals industries
ID: G1RT-CT-2002-05078
Data di inizio: 2002-04-01, Termine: 2005-03-31
Programme: FP5-GROWTH
Record Number: 62814
Last updated on: 2005-12-09
System for working on particleboard panels
ID: G1ST-CT-2002-50291
Data di inizio: 2003-11-01, Termine: 2005-12-31
Programme: FP5-GROWTH
Record Number: 70918
Last updated on: 2005-12-09
Selective separation of toxic metals from specific industrial wastewater streams for water and metals re-use (METASEP)
ID: EVK1-CT-2000-00083
Data di inizio: 2001-03-01, Termine: 2004-02-29
Many industrial wastewater streams contain toxic metal captions or their oxyanionsin concentrations up to 500 mg/l, which must be removed before water recycling or discharge. A new technology for wastewater treatment with water and metal reuse is to be developed and comprises:...
Programme: FP5-EESD
Record Number: 57213
Last updated on: 2005-07-28
Development of a robotic system for the inspection of aircraft wings and fuselage
ID: G4ST-CT-2000-50028
Data di inizio: 2001-05-01, Termine: 2003-04-30
Programme: FP5-GROWTH
Record Number: 54247
Last updated on: 2005-04-12
Powerline data exchange for domestic and industrial automation based on uwb approach
ID: G1ST-CT-2002-50338
Data di inizio: 2003-05-01, Termine: 2005-10-31
Programme: FP5-GROWTH
Record Number: 70066
Last updated on: 2005-04-12
Life cycle assessment of mining projects for waste minimisation and long term control of rehabilitated sites (LICYMIN)
ID: G1RD-CT-2000-00162
Data di inizio: 2000-03-01, Termine: 2003-08-31
The objective of the proposed project is to develop and validate a holistic approach to minimise the full life-cycle impacts of mining taking into account all the elements of the industrial mining and mineral processing system including waste disposal and remediation. Despite ...
Programme: FP5-GROWTH
Record Number: 51332
Last updated on: 2005-04-12
Incorporation of new technologies in the european precision foundry industry
ID: G1RT-CT-2001-05049
Data di inizio: 2001-11-01, Termine: 2004-10-31
The use of rapid prototyping models and simulation software in the precision foundry industry has brought distinct improvements in terms of time to market new products, cost savings, feeding design, opening of new markets etc. The main objective of this network is to promote t...
Programme: FP5-GROWTH
Record Number: 58452
Last updated on: 2005-04-12
12 3 > 
List retrieved on: 2018-05-25