{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"1491271","id":"101137892_PSHORIZON","title":"Periodic Reporting for period 1 - FrHyGe (Full qualification in France of large-scale HYdrogen underground storage and replication from Germany to all European countries)","teaser":"FrHyGe is dedicated to validating large-scale underground H2 storage (UHS) in salt caverns. Since March 2024, FrHyGe is led by a European consortium (17 partners) and coordinated by Storengy (StoSAS).Building on insights from the work of the HyPSTER project, demonstration of...","description":"periodic","summary":"FrHyGe is dedicated to validating large-scale underground H2 storage (UHS) in salt caverns. Since March 2024, FrHyGe is led by a European consortium (17 partners) and coordinated by Storengy (StoSAS).\nBuilding on insights from the work of the HyPSTER project, demonstration of the conversion of a 44-ton salt cavern into an UHS facility, StoSAS now focuses on:\n1) Scaling up to convert larger caverns\n2) Developing an extensive network of UHS across Europe to align with EU energy ambitions","workPerformed":"WP1: Project management \u0026 coordination\n- Set up tools to monitor project progress \u0026 Partner compliance with the Grant Agreement; \u0026 support technical, strategic, administrative, financial, \u0026 contractual coordination; both within the Consortium \u0026 with the CH JU. ERM was hired to support (PMO)\n- A regularly updated collaborative platform enables internal communication (Partners \u0026 Work Packages (WP)) \u0026 keeps Partners informed of their roles\/obligations\n- Structured meetings ensure effective communication with a shared, updated project schedule\n- A project plans were drafted to guide project Quality \u0026 Risk management\n \nWP2: Manosque Demonstrator objectives; conceptual design; scientific developments; \u0026 application to industrial scale replicators\n- WP2 partners started collecting data on caverns GA \u0026 GB (Manosque)\n- Methodologies for subsurface, skid unit \u0026 surface designs were published\n- Armines is gathering data for an experimental program\n- Other partners advanced R\u0026D on replication \u0026 H2 storage modelling using sonar data, including predictive cavern cycle modelling\n- Partners proposed a Mechanical Integrity Test (MIT) \u0026 tightness test for the demonstrator, \u0026 developed a bench to study H2 dissolution in brine \u0026 water vaporization kinetics\n- Replicability activities started in Harsefeld (Germany), building on insights from current\/ past projects to explore storage facility development at this location\n- Collaborating with WP5 (T5.3), WP2 partners initiated permitting discussions with competent authorities (DREAL)\n \nWP3: Demonstration TRL8 of H2 storage \u0026 cyclability in gas cavern\nWP3 activities are related to developing the Demonstrator \u0026 fed by the preliminary definition \u0026 conceptual design studies produced in April 2025 (WP2)\n- The basis of design of the Front-End Engineering Design (FEED) started in sequence for surface facilities\n- Partners involved participated in:\n1. discussions on the pilot conceptual design \n2. the basis of design for the FEED with a new optimized set of operating conditions\n- Meetings\/ discussions occurred for the different package interfaces\n- Contacts with Geosel are pursued to access information on brine facilities \u0026 request support for brine supply\/disposal during well integrity tests (MIT) \u0026 cycling period\n- For the subsurface, progress was made on MIT detailed program \u0026 on the H2 wellhead \u0026 completion design\n \nWP4: From regional implementation to market integration along EU H2 value chain\nWP4 first developed storylines for 2 replication projects (deliverable D4.1):\n1. GeoH2: Based on desk research, interviews \u0026 workshops, as well as expertise from StoSAS, NaTran \u0026 Capenergies. The analysis covers H2 production, offtake, import\/export (incl. cross-border), \u0026 electricity network constraints in Southeastern France\n2. SaltHy: context was more challenging (fewer FrHyGe partners directly involved in the discussions about the project\u2019s offtake and its implementation in a regional H2 hub). However, a methodological scope was validated; storyline implementation is planned for H2 2025\nWP4 then focused on the preparation of modelling (tasks 4.2 \u0026 4.4):\n- Reviewed existing CBA methodologies to identify UHS services \u0026 define indicators. This 1st bibliographic review led to a draft CBA with key H2 storage values\n- Identified model improvements needed for CBA \u0026 replication studies, \u0026 analyzed recent transition scenarios (TYNDP 2024)\n \nWP5: Environmental, safety \u0026 regulatory assessment\nWP5 aims at demonstrating the safety \u0026 environmental acceptability of UHS at Manosque \u0026 preparing for replication at Harsefeld. Significant progress was achieved through objectives \u0026 tasks monitoring  \u0026 planning, \u0026 deliverable preparation \u0026 completion:\n- Environmental impact assessment for the demonstrator (D5.7)\n- Hydrogen safety planning \u0026 management (D5.9)\n- Safety \u0026 risk assessment through Probability Risk Assessments, blowout modelling, \u0026 seismic surveillance (D5.11), confirming the demonstrator\u2019s acceptability within regulatory safety thresholds\n- Permitting \u0026 environmental documentation advanced (updated impact assessments, regulatory alignment with DREAL, \u0026 development of a robust Life Cycle Analysis (LCA) framework to quantify \u0026 monetize environmental effects)\n \nWP6: Communication, dissemination, exploitation\nWP6 coordinates communication, dissemination \u0026 exploitation activities to ensure visibility, knowledge sharing \u0026 long-term use of FrHyGe results.\n- Brand identity \u0026 communication tools were created to strengthen the project\u2019s visibility \u0026 coherence\n- The PEDR-C plan, including an initial Intellectual Property Rights (IPR) overview, was established early to guide partners. FrHyGe\u2019s website, LinkedIn \u0026 newsletters provide updates \u0026 cross-interviews with partners, reaching FrHyGe\u0027s target audience. \n- FrHyGe has been showcased at 1 major European H2 event \u0026 15 conferences\/workshops, with scientific publications \u0026 partner interventions increasing awareness of UHS solutions\n- 1st report on knowledge sharing \u0026 dissemination activities delivered, identifying target groups, main dissemination activities \u0026 achieved results since project start","finalResults":"WP1\n- The kick-off meeting (20\/03\/24) established the project \u0026 consortium\u0027s governance\n- 2 General Assemblies were carried out \u0026 instrumental in exchanging key information \u0026 early results between partners\nWP2 \u0026 WP3\n- The Manosque Demonstrator\u2019s conceptual design has been defined\n- The basis of design for the surface installations has been set\nWP4\n- GeoH2\u2019s storyline was implemented. SaltHy\u2019s storyline was defined \u0026 validated (identification of key data sources)\nWP5 \n- Hazard \u0026 Integrity Bounding: Completion of Preliminary Risk Analysis for MIT, initiation of cycling PRA. Quantitative bounding of cavern stability following a H2 blowout, demonstrates that integrity risks are localized \u0026 highly dependent on the well discharge path\n- Permitting \u0026 Environmental Validation: Agreement on the regulatory pathway with DREAL; completion of the Ecological Issues Report, concluding the project\u0027s non-significant residual impact on the Natura 2000 site following mitigation\n- Monitoring Framework: Issuance of the seismic surveillance plan (D5.11), confirming the fitness-for-purpose of existing network\n- Advanced Environmental Assessment: Establishment of a static\/dynamic LCA architecture incorporating risk-based emissions modeling \u0026 preparation of the monetization framework for CBA integration\nWP6\n- All initial milestones \u0026 key information shared on social media \n- An online resource has been published to share project\u2019s results\n- A knowledge-sharing \u0026 dissemination strategy has been set up \u0026 is regularly monitored\n- Project presented at +15 events","periodNumber":"1","periodFrom":"2024-03-01","periodTo":"2025-08-31","reportTypeDescription":"Periodic Reporting for period 1","identifiers":{"reportId":"421047"},"sourceUpdateDate":"2026-05-13 17:54:18","contentCreationDate":"2026-05-18 11:00:21","contentUpdateDate":"2026-06-17 11:39:31","lastUpdateDate":"2026-06-17 11:39:55","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"260607","id":"101137892","acronym":"FrHyGe","title":"Full qualification in France of large-scale HYdrogen underground storage and replication from Germany to all European countries","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"digitalAgenda","title":"Digital agenda","description":"This tracker monitors Horizon Europe\u2019s financial contribution to the development of digital technologies and the digitisation of the economy and society (known as \u2018Digital transition\u2019).","displayCode":"\/Digital agenda","attributes":{"weight":"0","classification":"policyPriorities","type":"marker"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"cleanAir","title":"Clean air","description":"This tracker monitors the Horizon Europe\u2019s financial contribution to the clean air policy (National Emission Ceiling Directive) aiming to improve ambient air quality and tackle air pollution, to protect the environment and human health.","displayCode":"\/Clean air","attributes":{"weight":"40","classification":"policyPriorities","type":"marker"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ai","title":"Artificial intelligence","description":"This tracker monitors Horizon Europe\u2019s financial contribution to the development and deployment of AI-based technologies and solutions. Projects that develop AI-tools as part of their research method are included","displayCode":"\/Artificial intelligence","attributes":{"weight":"0","classification":"policyPriorities","type":"marker"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"climate","title":"Climate action","description":"This tracker monitors the Horizon Europe\u2019s financial contribution to both mitigating climate change (e.g., contributions to the reduction of greenhouse gas emissions) and adapting to climate change by building resilience (e.g., regarding floods, droughts, spatial planning and better governance, adaptation to changing climate in value chains, etc.).","displayCode":"\/Climate action","attributes":{"weight":"100","classification":"policyPriorities","type":"marker"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"biodiversity","title":"Biodiversity","description":"This tracker monitors the Horizon Europe\u2019s financial contribution to Europe\u2019s biodiversity\u2019s path to recovery including species protection, ecosystem conservation, and habitat rehabilitation, all essential for resilience in climate adaptation and addressing ecosystem services but also environmental crime and the health-environment connection.","displayCode":"\/Biodiversity","attributes":{"weight":"0","classification":"policyPriorities","type":"marker"}},{"language":"en","availableLanguages":"en","code":"HORIZON-JU-IA","title":"HORIZON JU Innovation Actions","description":"HORIZON JU Innovation Actions","displayCode":"\/HORIZON JU Innovation Actions","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"705767","id":"HORIZON.2.5","code":"HORIZON.2.5","frameworkProgramme":"HORIZON","pga":"HORIZON.2.5","title":"Climate, Energy and Mobility","parent":{"rcn":"705740\/705725","code":"HORIZON.2\/HORIZON"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"en","rcn":"708123","id":"HORIZON_HORIZON-JTI-CLEANH2-2023-02-01","code":"HORIZON-JTI-CLEANH2-2023-02-01","frameworkProgramme":"HORIZON","title":"Large-scale demonstration of underground hydrogen storage","parent":{"rcn":"20300","code":"HORIZON-Topics"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","availableLanguages":"en","code":"43451560","title":"Energy collection, conversion and storage, renewable energy","displayCode":"\/Energy collection, conversion and storage, renewable energy","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"corda","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/horizon\/101137\/101137892_PS\/about-frhyge.png","mimetype":"image\/png","size":"780288","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/horizon\/101137\/101137892_PS\/project-partners.png","mimetype":"image\/png","size":"182272","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/horizon\/101137\/101137892_PS\/frhyge-4c.jpg","mimetype":"image\/jpeg","size":"906240","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}