{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"157466","id":"261788_PS","title":"Periodic Report Summary 2 - AFTER (A Framework for electrical power sysTems vulnerability identification, \ndEfense and Restoration)","teaser":"Project Context and Objectives:AFTER project aims at increasing the TSO capabilities in creating, monitoring and managing secure interconnected electrical power system infrastructures, being able to survive major failures and to efficiently restore service supply after major...","summary":"Project Context and Objectives:\nAFTER project aims at increasing the TSO capabilities in creating, monitoring and managing secure interconnected electrical power system infrastructures, being able to survive major failures and to efficiently restore service supply after major disruptions.\nAFTER project Objectives\n\u2022\tto develop a framework for risk and vulnerability assessment of the interconnected power system considering both natural and manmade, (Power System and ICT) failures. \n\u2022\tto introduce innovative defence plan concepts and techniques to manage multiple contingencies and assessment methodologies, to assess their effectiveness. \n\u2022\tto develop innovative restorative control by designing a framework to support the restoration stages of the integrated power systems considering multiple contingencies.\nProject  objectives will be met with the definition of a framework, methodologies, tools and techniques, in particular for:\n\u2022\tto assess the risk (hazard, vulnerability and impact analysis) of the interconnected and integrated electrical power and ICT systems;\n\u2022\tto evaluate and to enhance the security and resilience of complex energy systems;\n\u2022\tto design and assess of global defence and restoration plans.\nThe development of AFTER framework will requires:\n\u2022\tthe analysis of threats, vulnerabilities, failures of different component and (sub-)systems and the identification of models of the dependency of the power system from the ICT systems\n\u2022\tthe definition of appropriate risk assessment methods and risk indices\n\u2022\tthe definition of physical security methods and techniques\n\u2022\tthe definition of criteria and techniques for defence and restoration.\n\nProject Results:\nAFTER project aims at increasing the TSO capabilities in creating, monitoring and managing secure interconnected electrical power system infrastructures, being able to survive major failures and to efficiently restore service supply after major disruptions.\nAFTER project Objectives\n\u2022\tto develop a framework for risk and vulnerability assessment of the interconnected power system considering both natural and manmade, (Power System and ICT) failures \n\u2022\tto introduce innovative defence plan concepts and techniques to manage multiple contingencies and assessment methodologies, to assess their effectiveness\n\u2022\tto develop innovative restorative control by designing a framework to support the restoration stages of the integrated power systems considering multiple contingencies\nProject  objectives will be met with the definition of a framework, methodologies, tools and techniques, in particular for:\n\u2022\tto assess the risk (hazard, vulnerability and impact analysis) of the interconnected and integrated electrical power and ICT systems;\n\u2022\tto evaluate and to enhance the security and resilience of complex energy systems;\n\u2022\tto design and assess of global defence and restoration plans.\nThe development of AFTER framework will requires:\n\u2022\tthe analysis of threats, vulnerabilities, failures of different component and (sub-)systems and the identification of models of the dependency of the power system from the ICT systems\n\u2022\tthe definition of appropriate risk assessment methods and risk indices\n\u2022\tthe definition of physical security methods and techniques\n\u2022\tthe definition of criteria and techniques for defence and restoration.\n\nPotential Impact:\nAFTER project will have relevant impacts on the security and resilience of complex interconnected energy networks: increased exploitation of the transmission grid, reduction of blackout occurrence, extension, and duration. This impact relies on the main results of AFTER, i.e. the combined analysis of the integrated power and ICT infrastructures and the risk-based approach to security. Both of them overcome the methodologies and practices currently adopted by TSOs. \nFurther, AFTER approach to security assessment of power networks will cause a leap in European industrial know-how and competitiveness and result in a competitive edge in knowledge and technology for network operation and industry in Europe. In particular, the Power System industry will be able to develop a new generation of EMS functions based on integrated risk analysis. Similar tools will be proposed to support (operational-) planning activities. Besides products, significant engineering and consultancy services can arise from the expertise gained with AFTER, related to integrated power and ICT system vulnerability analyses, defence plan design, etc. \nAFTER will impact on the activity of analysts, planners, operational planners, control centre operators, power system and communications engineers. AFTER results will enhance their capability to design and operate more dependable systems by providing better insights into the problems and easier ways to analyse architectural, functional, and operational solutions.  \nBesides developing new integrated methodologies also with the contribution of TSOs, AFTER will contribute to make the results be accepted by the users.\nFurthermore, AFTER results will enhance  the confidence in the integrated, risk based approaches to system analysis and contingency planning to reduce security gaps. The project will enforce long-term future collaboration even after ending of the project enforcing the practical application of project results as well as its integration in national and international standards. \n\n\nList of Websites:\nhttp:\/\/www.after-project.eu\/\n","reportTypeDescription":"P-CSA-NoE Periodic Report","identifiers":{"reportId":"1210194"},"sourceUpdateDate":"2017-02-20 12:41:50","contentCreationDate":"2015-02-18 18:06:42","contentUpdateDate":"2015-02-18 18:09:35","lastUpdateDate":"2025-09-17 22:34:18","archivedDate":"2024-06-23 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"sesam","title":"SESAM","description":"RTD FP7 reporting system (including FP6 Marie Curie)","displayCode":"\/SESAM","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"3123491","legalName":"RICERCA SUL SISTEMA ENERGETICO - RSE SPA","address":{"country":"IT"},"contenttype":"organization","attributes":{"source":"sesam","type":"relatedOrganization"}},{"availableLanguages":"en","rcn":"100196","id":"261788","acronym":"AFTER","title":"A Framework for electrical power sysTems vulnerability identification,dEfense and Restoration","archivedDate":"2024-06-18 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/73\/451\/1161","title":"electric energy","displayCode":"\/engineering and technology\/electrical engineering, electronic engineering, information engineering\/electrical engineering\/electric energy","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/29\/97\/67681549\/33870553","title":"terrorism","displayCode":"\/social sciences\/political sciences\/political transitions\/terrorism","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/23\/45\/293\/913","title":"natural disasters","displayCode":"\/natural sciences\/earth and related environmental sciences\/physical geography\/natural disasters","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"CP","title":"Collaborative project (generic)","displayCode":"\/Collaborative project (generic)","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"861","id":"FP7-SECURITY","code":"FP7-SECURITY","frameworkProgramme":"FP7","pga":"FP7-SECURITY","title":"Specific Programme \u0022Cooperation\u0022: Security","shortTitle":"Security","parent":{"rcn":"846\/1401\/837","code":"FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-12 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"12894","id":"FP7_SEC-2010.2.3-2","code":"SEC-2010.2.3-2","frameworkProgramme":"FP7","title":"Assessment framework and tools to identify vulnerabilities of energy grids and energy plants, and to protect them against cascading effects","parent":{"rcn":"10484\/10350\/11558\/861\/846\/1401\/837","code":"SEC-2.3\/SEC-2\/SEC\/FP7-SECURITY\/FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-14 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"sesam","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/261\/261788\/periodic2-after-summary.pdf","mimetype":"application\/pdf","size":"80099","contenttype":"webItem","attributes":{"source":"sesam","type":"relatedResultAttachment"}}],"regions":[{"name":"Italy","rcn":"309758504","nutsCode":"IT","euCode":"IT","isoCode":"IT","attributes":{"source":"sesam","type":"relatedRegion"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}