{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"183683","id":"308908_PS","title":"Final Report Summary - E-HIGHWAY2050 (Modular Development Plan of the Pan-European Transmission  System 2050)","teaser":"The e-Highway2050 project is a collaborative research and demonstration project supported by the EU Seventh Framework Programme (Grant Agreement N\u00b0308908) and aimed at:-\tdeveloping a methodology to support the planning of the Pan-European Transmission...","summary":"Executive Summary:\nThe e-Highway2050 project is a collaborative research and demonstration project supported by the EU Seventh Framework Programme (Grant Agreement N\u00b0308908) and aimed at:\n-\tdeveloping a methodology to support the planning of the Pan-European Transmission Net-work, capable of meeting European needs between 2020 and 2050 and in line with the Eu-ropean energy policy pillars, as well as\n-\tillustrating it through the delivery of a Modular Development Plan of the pan-European transmission system at the 2050 time horizon and supporting the planning of a pan-European \u0022Electricity Highway System\u0022.   \n\nThe 40-month research and development e-Highway2050 was launched in September 2012 and  has been performed by a consortium of 28 partners including Transmission System Operators (TSO), Research and Development performers, energy agencies, associations and other professionals, under the technical management and coordination of RTE (the French TSO).\n\nThe project workflow was developed around five extreme but realistic scenarios at long term hori-zon. The pan-European power system is represented by a consistent set of zones, while system simulations are performed in order to highlight weak points of the transmission grid. This led to identify few grid architectures per scenario, corresponding to technological choices reflecting each a different degree of public acceptance of the deployment of new overhead lines. A Cost-Benefit Analysis was then performed in order to score the architectures and assess the most efficient one, constituting the basis for analysing optimal implementation routes from now up to 2050. \n \nThe e-Highway2050 project reached successfully its complementary overarching goals, namely the modular plan at 2050 for the pan-European System and the development of novel planning meth-odologies.\n\nThe final results of the research project have been displayed in various forms including the final international conference, presentations to events and workshops, public deliverables, short adver-tising movie, synthetic booklet of results, articles in various conferences. Results of research have also been presented in international conferences and are available through the project website http:\/\/www.e-highway2050.eu\/e-highway2050\/ or through the European Electricity Grid Initiative (EEGI) knowledge Sharing Platform  http:\/\/www.gridinnovation-on-line.eu\/.   \nThe project has also been labelized Core project by the EEGI in December 2013. \n\nAfter the project completion, the main results of the e-Highway2050 project are expected to be further developed, used and disseminated. More specifically, the top-down planning methodology  organized in modular blocks, the modular plan of pan-European grid architectures at 2050 (including data), and the database of cost and performances of power system technologies are expected to be further used by ENTSOE for the preparation of future TYNDP exercises.  \n\nProject Context and Objectives:\nThe Energy Union policy has fixed ambitious goals for 2020 and 2030, for the climate protection,\nwhere the interconnected European electricity grid with more cross-border interconnections, stor-age\nfacilities, and smart grids to manage demand should ensure a secure energy supply in a system with\nhigher shares of variable renewable energy. In this respect the gradual construction of the pan-\nEuropean electricity highways should play a key role.\nHowever, the related high investment costs of such infrastructures relating the big consumption centres to the often decentralized location of Renewable Energy Sources generation imply a new methodology of analysis oriented to the very long time horizon and considering the spatial com-plexity of the European continent with regard to the transmission system.\n\nIn that context the e-Highway2050 project was launched with two complementary overarching goals:\n-\tthe identification of the European grid architectures that could be necessary at that time horizon under five contrasted low-carbon energy scenarios and the related expansion plan for the pan-European electricity transmission network from 2030 to 2050, as well as \n-\tthe development of novel planning methodologies of the pan-European electricity trans-mission network, able to address very long-term horizons allowing further implementation of such innovative top-down methodologies in a rigorous and transparent way. \n\nProject Results:\nFour main achievements have been reached by the e-Highway2050 project (ended in December 2015): \n-\tTop-down planning methodology  organized in modular blocks \n-\tThe modular plan of pan-European grid architectures at 2050 (including data)\n-\tA database of cost and performances of power system technologies \n-\tA toolbox for carrying out advanced benefit cost analyses\n-\tEnhanced transmission expansion planning based on optimisation methods.\n\nA detailed exploitation plan (deliverable D9.3.2) has analytically detailed each piece of foreground produced by the project and available for exploitation (30 identified elements), each of these 30 ele-ments being either a methodology, an application of methodology or recommendations for a given class of stakeholder. \n\nThe identified foreground was then analyzed with regard to its potential of exploitation according to one of the five identified forms of exploitation, namely: \n-\tA future TYNDP exercise by ENTSO-E; \n-\tNew RD\u0026D and services based upon project findings (two-sided, typically bilateral contracts between one TSO and a non-TSO)\n-\tNew RD\u0026D and services based upon project findings (multilateral, at the pan-European scale) \n-\tData sets \/ data bases created by the project that have a long-term (2050), pan-European dimension (maintenance and exploitation of these databases)\n-\tData sets \/ data bases that have a long-term (2050), with a pan-European dimension (use by associations, NGOs, institutions in their missions). \n\nThe five achievements consist in a set of the identified foreground (see id code in the box below)\n-Achievement 1 includes the identified foreground: 1.1, 2.1, 2.3, 2.5, 3.1, 4.1, 4.2, 4.3, 5.1\n-Achievement 2 includes the identified foreground: P.1, 1.2, 2.2, 2.4, 2.6, 2.7, 5.2, 6.3\n-Achievement 3 includes the identified foreground: 3.2\n- Achievement 4 includes the identified foreground: 6.1, 6.2\n-Achievement 5 includes the identified foreground: 8.1, 8.2.\n \nResults were regularly presented to the public and to targeted audiences through dedicated work-shops and consultations. Policy-makers in governments, regulatory agencies and the electricity industry, which have been included in the research process from the outset by the consortium partners, are expected to use the proposed solutions as the groundwork for the subsequent ex-pansion of the pan-European transmission network. \nIn parallel the network planning methodology is made available to all ENTSO-E members and be-yond in order to serve in future as the basis for further research and innovations in the develop-ment of improved planning tools for the network expansion.\nIn order to allow an easy access to project public deliverables the following table of correspondence links each individual piece of foreground to the type of support and to the physical location where a potential user could access to the created knowledge.\n \nPotential Impact:\nAfter the project completion, the main results of the e-Highway2050 project are expected to be further developed, used and disseminated as described in the e-Highway2050 Final Exploitation Plan (D9.3.2). \n\nMore specifically, the top-down planning methodology  organized in modular blocks, the modular plan of pan-European grid architectures at 2050 (including data), and the database of cost and per-formances of power system technologies are expected to be further used by ENTSOE for the prep-aration of future TYNDP exercises. Practical implementation according to the exploitation plan pro-posed by the project are currently under validation by the ENTSOE TYNDP teams.\n\nIn parallel some partners intend to continue the development of the enhanced transmission ex-pansion planning based on optimization methods.\n \nPeriod m1-m12\nScientific publications (peer reviewed) \n-\t\u0022e-HighWay2050: A Modular Development Plan on Pan-European Electricity Highways System for 2050\u0022, submitted to CIGRE Lisbon conference,  22-24 April 2013, Portugal\nParticipation in International Conferences  \n-\tCIGRE - Lisbon symposium \u0022Smarts Grids: Next Generation Grids for New Energy Trends\u0022, 22-24 April 2013 , Portugal  \n-\tSmart Grids Paris, June 2013 \n-\tEURELECTRIC Annual Convention \u0026 Conference 2013 - Innovative Investments: Re-energising Europe, Bologna, 3-4 June 2013 \n-\tEuropacable General Assembly,  Brussels , 27 June 2013 \nParticipation in public workshops\n-\tEHSP workshop, EC , 9 October 2012, Brussels \n-\t23rd meeting of the European Electricity Regulatory Forum, Florence Forum, 20 November 2012\n-\tInnogrid2020+, 20-21st February 2013, Brussels\nE-Highway2050 communication material \n-\tProject public web site   \n-\tPress release \n-\tBrochure; Poster  \n\nPeriod m13-m24\nScientific publications (peer reviewed) \n-\tFuture electricity highways for pan-European transmission systems: A GB Transmission System Perspec-tive, G. A. Taylor, A. H. Alikhanzadeh and A. Zobaa, presented at UPEC2014 (Cluj, Romania), 2-5 Sep-tember 2014\n-\tA cost and performance database of power system technologies in support of the development of the pan-European electricity highways system at the 2050 time horizon, E. Peirano et alia, presented at CI-GRE Belgium, Innovation for secure and efficient transmission grid, 12-14 March 2014\n-\tA methodology for the development of the Pan-European Electricity Highways System for 2050, T. An-derski, S. Galant, G. Migliavacca, G. Sanchis, presented at Cigre, Paris (France), 24-29 August 2014\nParticipation in International Conferences  \n-\tUPEC 2013, 2-5 Sept 2013, Dublin (Ireland)\n-\tEWEA Offshore 2013, 19-21 November 2013, Frankfurt (Germany)\n-\tEurelectric DSO Power Distribution conference, 28 November 2013, Brussels (Belgium)\n-\t4th International ETP Conference \u201cUnderground Cables: High performance transmission - underground\u201d, 30-31 January 2014 (Germany)\n-\tPower Tech 2014 \u201cAdvanced Technologies in Power Transmission to Improve Infrastructure Manage-ment\u201d, 12-13 February 2014, Amsterdam (the Netherlands)\n-\tCigre Belgium, \u201cInnovation for secure and efficient transmission grids\u201d, 12-14 March 2014 Brussels (Bel-gium)\n-\tInnogrid2020+, 25-26 March 2014, Brussels\n-\tEuropean Energy Market 2014 (EEM14), 28-30 May 2014 in Krakow (Poland)\n-\tCigre Biennial Session, Paris, 24-29 August 2014\n\nParticipation in public workshops\n-\tSee WP7 on the eHighway2050 workshops\n\ne-Highway2050 communication material \n-\tPosters presented at Innogrid2020+\n-\tPoster presented at CIGRE Belgium conference, March 2014 \n-\tPoster presented at EWEA Offshore, November 2013 in Frankfurt\n-\tThe REVOLVE booklet\n\nPeriod m25-m40 and scheduled events beyond project end\nScientific publications (peer reviewed) \n-\tA Novel Methodology to Analyze the Impact of Future ICT Infrastructure on a Planned Pan-European Transmission System. Co-authors: Amir Hessam Alikhanzadeh, Member, IEEE, Ioana Pisica, Member, IEEE, Christopher S. Saunders, Gareth A. Taylor, Senior Member, IEEE, Ahmed F. Zobaa, Senior Member, IEEE, Phillip M. Ashton. Article in the IEEE Transactions on Industrial Informatics special issue. Special issue on \u2018Enabling Technologies and Methodologies for Knowledge Discovery and Data Mining in Smart Grids\u2019:  http:\/\/tii.ieee-ies.org\/ March 31, 2015.  \n-\tThe cost-benefit analysis methodology for long term transmission planning developed in the framework of the project e-Highway2050. Article in Energy Policy journal (Elsevier) submitted to the International Journal of Energy Sector in January 2015. Co-authors: S. Rossi, G. Migliavacca, F. Careri (RSE) , L. Olmos, A. Ramos, M. Rivier (Comillas), J. Sijm (ECN), D. Huang, D. Van Hertem (KU Leuven).   \n-\tInnovative grid and generation technologies for future European power system. Karel M\u00e1slo, Rui Pestana, Kai Strunz, Silvia Moroni, Pablo Centeno, Maciej Wilk. Article presented to the 12th Internation-al conference on the European Energy Market. Lisbon, 20-22 May 2015, Portugal. \n-\t\u201cA fundamental study on the impact of HVDC lines on transient stability of power systems. L. Sigrist, F. Echavarren, L. Rouco, P. Panciatici. Article presented in Powertech conference in Eindhoven, The Nether-lands, 29 June - 2 July 2015    \n-\t\u201cThe role of spatial correlations in Monte Carlo studies on power system\u201d. B. Seguinot, A. Zani, Power-tech, Eindhoven, Article presented in Powertech conference in Eindhoven, The Netherlands, 29 June - 2 July 2015 \n-\tNetwork Partition Based on Critical Branches for Large-Scale Transmission Expansion Planning. S. Lum-breras, A. Ramos, L. Olmos, F. Echavarren, F. Banez-Chicharro, M. Rivier, P. Panciatici, J. Maeght, C. Pache. Article presented in Powertech conference in Eindhoven, The Netherlands, 29 June - 2 July 2015    \n-\t\u201cSnapshot selection based on statistical clustering for transmission expansion planning. S. Agapoff, C. Pache, P. Panciatici, L. Warland, S. Lumbreras. Article presented in Powertech conference in Eindhoven, The Netherlands, 29 June - 2 July 2015    \n-\tEnhanced Pan-European Transmission Planning Methodology. C.  Pache, J. Maeght,  B.Seguinot, A. Zani, S. Lumbreras, A. Ramos, S. Agapoff, L.Warland, L.Rouco Article presented to the IEEE PES GM conference in Denver, July 26 \u2013 July 30, 2015. \n-\tArticle to the 14th IAEE European Energy Conference \u2014Sustainable Energy Policy and Strategies for Europe,  Rome, 28-31 October 2014, LUISS University of Roma\n-\te-Highway2050: a research project analyzing very long term investment needs for the pan-European Electricity transmission system. T. Anderski, N.  Grisey, E. Momot, D. Orlic, K. Bruninx, D. Couckuyt. Article presented at the CMDM 2015 \u2013 Cigre in Bucharest, Romania, 5th to 8th of October 2015.\n-\te-Highway2050: Planning the European transmission grid for 2050. Grisey, Nathalie; Sanchis, G\u00e9rald; Anderski, Thomas; Migliavacca, Gianluigi; Peirano, Eric; Vafeas, Athanase; Pestana, Rui. Article to be pre-sented in ENERGYCON 2016, Leuven, Belgium. 4-8 April 2016\n-\tCigre Paris 2016: Article \u201cSystem Development and Economics : New System Solutions and Planning Techniques for Flexible and Robust System Plan\u201d (article under preparation under the coordination of T. Anderski at the project end)\n\nParticipation in International Conferences  \n-\tUPEC (Universities\u2019 Power Engineering Conference) 2 -5 September 2014, Romania Communication \u201cIm-pacts of ICT on the pan-European Power Systems up to the 2050 Time Horizon\u201d submitted by Brunel on February 21st  \t \n-\tCommunication to ENTSOE. Communication to System Operation Committee dated 17th September 2014. Communication to Staff meeting dated 7 July 2014\t \n-\t14th IAEE European Energy Conference \u2014Sustainable Energy Policy and Strategies for Europe, Rome, 28-31 October 2014, LUISS University of Roma. Joint paper WP2-WP9-Coordinator on interim results of WP2.  \n-\tUtility Week 2014, 4-6 November 2014, Amsterdam, the Netherlands. The grid \u0026 Renewables integra-tion. e-Highway2050 project. Presentation by  G\u00e9rald Sanchis, project coordinator\t \n-\tOVANET Workshop \u201cHVDC Grids for Infrastructure Integration and International Connection\u201c, November 19, 2014, Berlin\t\u201cHVDC Grids for infrastructures integration and international connection\n e-Highway2050 project\u201c. Presentation by G\u00e9rald Sanchis, project coordinator\t\n-\tENTSO-E Conference: Securing Europe\u2019s Competitive Energy Future, Brussels, 19 November 2014. Oral communication on e-Highway2050 project: \u201cThe electricity grid in 2050\u201d, Pierre BORNARD, Chairman of the board, ENTSO-E in Session II- A Design the Power System of tomorrow based on the needs for System Security, Market Integration and Sustainability \t \n-\tNew Technologies for the Future Power Grid 26 November 2014, Leuven, Belgium. \u201cCost and perfor-mance data base for transmission technologies at the 2050 time horizon\u201d. Presentation by Eric Peirano, Technofi\n-\tNew Technologies for the Future Power Grid 26 November 2014, Leuven, Belgium. \u201cEuropacable contri-bution to Transmission Technology Scenarios\u201d. Presentation by Volker Wendt\t \n-\tKabeldag 2014, Congress Center Elektrum, hosted by DNV GL, 27 Nov 2014, Arnhem (NL) International development in cable technology. Presentation for DNV GL Kabeldag 2014 by Dr. Volker Wendt, Eu-ropacable\n-\tIIR Konferenz Erdkabel, Vienna, Austria, 3 Dec 2014. Communication of Dr. Volker Wendt, Europacable\n-\t5th International ETP Conference: Underground cables in High-Capacity Transmission, 29-30 January 2015, Berlin, Germany. Communication by Europacable on WP3 findings HVAC and HVDC Cable tech-nologies for the Pan-European Transmission System 2050 \u201cUnderground Cables in High-Capacity Transmission\u201d Dr. Volker Wendt, Director Public Affairs, Europacable\t \n-\tEwea Offshore 2015, 10 - 12 March 2015, Copenhagen, Denmark. Poster presented by EWEA\n-\tPower Transmission Tech  2015, 25-26 March 2015, Vienna, Austria. G. Migliavacca chairman of the event presented the project available results\t \n-\tInnogrid2020+, 31March, 1st April 2015. Participation to the poster session and communication by the coordinator on the project available results\t \n-\tAll-Energy 2015, 6-7 May 2015, Glasgow. Topic of \u2018Grid and Smart Grid\u2019. Presentation by Gary Keane,  Poyry\n-\t12th International conference on the European Energy Market. Lisbon, 20-22 May 2015, Portugal. Arti-cle submitted: Innovative grid and generation technologies for future European power system. Karel M\u00e1slo, Rui Pestana, Kai Strunz, Silvia Moroni, Pablo Centeno, Maciej Wilk\n-\tBorealis \u0026 Borouge Jicable Conference, Paris, 22 June 2015. Communication of Gerald Sanchis\n-\tPowerTech, Eindhoven, The Netherlands, 29 June - 2 July. Four papers (RTE): The importance of spatial correlations in Monte Carlo adequacy simulations; Network partition based on critical branches for large-scale transmission expansion planning; Snapshot selection based on statistical clustering for transmission expansion planning; A fundamental study on the impact of HVDC lines on transient stabil-ity of power system\n-\tPowerTech, Eindhoven, The Netherlands, 1 July 2015. Dedicated event for the e-Highway2050 project within the PowerTech 2015 conference. Participants: RTE, Amprion and RSE\t\n-\tWorkshop of presentation of draft results to ENTSOE:  ENTSO-E Board and e-Highway2050 Workshop on Results of Electricity Highways, 7 July 2015, Brussels            \n-\tIEEE PES GM, Denver, July 26 \u2013 July 30, 2015 General paper on WP8 results\t\n-\tCIGRE Bucharest, CMDM 2015 (3rd edition) International Conference on Condition Monitoring, Diagno-sis and Maintenance 2015, 5-8 October 2015. Ath\u00e9n\u00e9e Palace Hilton Hotel, Bucharest. Article: \u201ce-Highway2050: a research project analyzing very long term investment needs for the pan-European Elec-tricity transmission system\u201d\n-\tAEIT annual Conference \u2013 October 2015. A Sustainable Development in the Mediterranean Area, Na-ples, 14-16 October 2015. Participation to a panel session : Euromediterranean Supergrid \u2013 FP7 eHigh-way2050\n-\tEWEA annual conference 2015 17 November 2015, Paris. Participation to a panel session\n-\tCOP21\/CMP21 EU side events; 30 Nov-11 December 2015. Presentation of the results of the eHigh-way2050 project\n-\tENERGYCON 2016 hosted by KUL, 4-8 April 2016. Article: \u201ce-Highway2050: Planning the European transmission grid for 2050\u201d. N. Grisey, G. Sanchis; T. Anderski, G. Migliavacca, E. Peirano, A. Vafeas, R. Pestana\n-\tCigre Paris 2016: Article to be presented (Study Committee SC1): \u201ce-Highway2050: a research project analysing very long term investment needs for the pan-European transmission system\u201d. T. Anderski, F. Careri,  N. Grisey, G.Migliavacca, D. Orlic, G. Sanchis\n\nParticipation in public workshops\n-\tSee D7.3 on the eHighway2050 workshops: WP8 workshop in Madrid 28th\u201329th May 2015\n\ne-Highway2050 communication material \n-\tPoster on draft results presented at Innogrid2020+\n-\tShort video on project results presented at the final conference\n-\tBooklet on project results (50 pages length) presented at the final conference\n\nOther\n-\tTwitter account:  @e_Highway2050 \n-\tProject website: http:\/\/www.e-highway2050.eu\/e-highway2050\/ \n-\tKnowledge Sharing Platform: http:\/\/www.gridinnovation-on-line.eu\/  \n\nRegarding the exploitation of results the complete analysis is made in D9.3.2. This document details the cross-analysis of the 30 pieces of foreground for each of the five identified form of exploitation. The 30 pieces of foreground include :\n-\t18 e-Highway2050 \u201cmethodology\u201d results, \n-\t9 e-Highway2050 \u201capplication of the methodology\u201d results and the \n-\t3 e-Highway2050 \u201cset of recommendations\u201d results.\n\nList of Websites:\nThe public website of the e-Highway2050 project is located at http:\/\/www.e-highway2050.eu\/e-highway2050\/ \n\nOther related information platform:  \n\u2022\tthe EEGI knowledge sharing platform developed by Grid+ project:   http:\/\/www.gridinnovation-on-line.eu \n\nSocial medias have also been used by the project: \n\n\u2022\tThe project website (news) http:\/\/www.e-highway2050.eu\/news\/ \n\u2022\tSocial media: Twitter account twitter.com\/e_Highway2050 \n\u2022\tYouTube channel  https:\/\/www.youtube.com\/user\/eHighway2050\/videos\n","reportTypeDescription":"P-CSA-NoE Final Report","identifiers":{"reportId":"1331903"},"sourceUpdateDate":"2017-02-21 16:33:09","contentCreationDate":"2016-06-06 12:28:34","contentUpdateDate":"2016-06-06 12:31:24","lastUpdateDate":"2025-09-24 17:43:43","archivedDate":"2024-06-23 00:00:00","relations":{"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"151885","id":"151885-novel-methodologies-and-plans-for-europes-future-secure-and-sustainable-electricity-infrastru","title":"Novel methodologies and plans for Europe\u0027s future secure and sustainable electricity infrastructure","teaser":"An EU initiative developed a pan-European power transmission network, including possible highways, to meet European energy needs between 2020 and 2050.","contentUpdateDate":"2016-10-28 15:41:38","archivedDate":"2024-06-10 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"ener","title":"Energy","displayCode":"\/Energy","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"brief","title":"Result in Brief","description":"Article: Classic and enhanced","displayCode":"\/Result in Brief","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/results\/images\/2016-10\/151885.jpg","mimetype":"image\/jpeg","size":"0","copyright":"\u00a9 averess, Thinkstock","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"availableLanguages":"en","rcn":"3101128","legalName":"RTE RESEAU DE TRANSPORT D ELECTRICITE SA","address":{"country":"FR"},"contenttype":"organization","attributes":{"source":"sesam","type":"relatedOrganization"}},{"availableLanguages":"en","rcn":"106279","id":"308908","acronym":"E-HIGHWAY2050","title":"Modular Development Plan of the Pan-European Transmission  System 2050","archivedDate":"2024-06-18 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/29\/101\/559","title":"governance","displayCode":"\/social sciences\/sociology\/governance","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/73\/451\/1209\/1705","title":"electric power transmission","displayCode":"\/engineering and technology\/electrical engineering, electronic engineering, information engineering\/electrical engineering\/power engineering\/electric power transmission","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"CP","title":"Collaborative project (generic)","displayCode":"\/Collaborative project (generic)","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"856","id":"FP7-ENERGY","code":"FP7-ENERGY","frameworkProgramme":"FP7","pga":"FP7-ENERGY","title":"Specific Programme \u0022Cooperation\u0022: Energy","shortTitle":"Energy","parent":{"rcn":"846\/1401\/837","code":"FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-12 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"18229","id":"FP7_ENERGY.2012.7.2.1","code":"ENERGY.2012.7.2.1","frameworkProgramme":"FP7","title":"Planning for European Electricity Highways to ensure the reliable delivery of renewable electricity and pan-European market integration","parent":{"rcn":"10130\/10128\/10962\/856\/846\/1401\/837","code":"ENERGY-7.2\/ENERGY-7\/ENERGY\/FP7-ENERGY\/FP7-COOPERATION\/EC\/FP7"},"archivedDate":"2024-06-14 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"sesam","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/308\/308908\/final1-160329-e-highway2050-summary.pdf","mimetype":"application\/pdf","size":"95865","contenttype":"webItem","attributes":{"source":"sesam","type":"relatedResultAttachment"}}],"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"sesam","title":"SESAM","description":"RTD FP7 reporting system (including FP6 Marie Curie)","displayCode":"\/SESAM","attributes":{"classification":"source","type":"isProvidedBy"}}],"regions":[{"name":"France","rcn":"258902568","nutsCode":"FR","euCode":"FR","isoCode":"FR","attributes":{"source":"sesam","type":"relatedRegion"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}