{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"194903","id":"649753_PS","title":"Periodic Reporting for period 2 - OrbEEt (ORganizational Behaviour improvement for Energy Efficient adminisTrative public offices)","teaser":"Tertiary sector buildings sector consume a sizeable proportion of EU total energy consumption and the majority of consumption is directly attributed to the operational phase of the building life-cycle. Occupant behaviour is a major cause of this consumption. The goal of OrbEEt...","description":"periodic","summary":"Tertiary sector buildings sector consume a sizeable proportion of EU total energy consumption and the majority of consumption is directly attributed to the operational phase of the building life-cycle. Occupant behaviour is a major cause of this consumption. \nThe goal of OrbEEt project is to establish a trusted Systemic Enterprise Operational Rating framework, that will also present the ability for real time building monitoring, continuous measurement of the impact of different activities on the overall building energy performance and most importantly, for timely, relevant and personalized feedback that will aim at triggering sustainable behaviours. Within OrbEEt, energy efficiency will be achieved through progressive improvement of organizational efficiency, while energy performance will be optimally balanced with business performance and occupant preferences to avoid organizational performance degradation or loss of occupant comfort.\nThe systemic approach introduced within OrbEEt was expected to reduce energy consumption by 20-25%, providing significant benefits for public building occupants\/owners\/administrators and the society in total. Apart from economic benefits stemming from energy savings\/bill reductions, the fully fledged approach introduced in OrbEEt should generate significant reduction of raw materials, CO2 and other GHG (Green House Gas) emissions associated with building energy consumption. The systemic reduction of demand may consequently lead to comparable reduction of required production levels with obvious emissions reduction effect. Improvements in the quality and security of energy supply and the efficiency of the grid may be also achieved; considering also peak demand reduction potential.","workPerformed":"Taking into account the comments received from the reviewers during the 1st review of the project (end M20), the WP2 was extended for 2 months to properly describe the methodology: \n\u2022\tTo measure energy consumption savings (i.e. Baselines have to be properly identified to measure the achievements of the project).\n\u2022\tTo engage end users \n\u2022\tTo measure behavioural change\nIn the project we manage to address this objective and the available models are available to the public audience through an open repository.\n\nWP3 is about the development of the OrbEEt platform and further the installation and configuration to the different pilot sites. While the development of the different modules was performed as part of the 1st reporting period, the integration, lab testing, configuration and deployment was performed in the 2nd reporting period. \nThe 2nd Period has focused upon actions and activities to validate and evaluate the deployed system in premises ensuring the active engagement of end users in premises into the WP4\n\nThe main outcomes of the work performed in WP4 (vs. DoA objectives) are further presented:\n-\tEnd-User Training Completed by M18\n-\tAt least 4 workshops for awareness and collaboration throughout the project per pilot site\n-\tSoftware evaluation and fine-tuning by M36 and end-user acceptance \u003E90%\n-\tSoftware Evaluation and Fine-Tuning throughout the pilot validation\n-\t12-monhts full validation of OrbEEt framework in premises\n-\t4 pilot buildings actively engaged in the pilot roll out\n-\t Over 15% of consumption, CO2 emissions \u0026 peak demand reduction\n-\t2-3 years of pay-back period","finalResults":"In the project the major progress in the modelling domain has been in the area of the application of Hybrid Method Engineering. Enterprise (Energy-Related) Behavioural Modelling viewpoints are identified according their domain, the level of technical granularity, the degree of formalisation, and cultural aspects of relevant community, towards the definition of skeleton activity profile models (energy related) that will utilize conceptual and technical results from ComVantage and BIVEE, further elaborate and adapt them to the needs of the OrbEEt Automated Operational Rating Framework.\nSo far the expected potential impacts in terms of socio-economic and wider societal implications are: (1) Obtaining several project products; (2) Energy savings; (3) Engagement of end users at pilot sites.\n\nOrbEEt extends the concept of DECs towards delivering certificates of significantly enhanced spatio-temporal granularity by establishing a dynamic model-based approach (models, methods \u0026 tools) for a continuous estimation of their constituent metrics and indicators. DECs are continuously updated using actual building measurements and made available to occupants\/visitors at almost real time. Enhanced DECs take into account all major loads related to organizational activities and most importantly, they will establish a direct link between energy performance and various elements of the organizational ecosystem (spaces\/offices, teams \u0026 activities), allowing for a more systemic view (drill-down and drill-through) beyond typical DECs. \n\nThis is a main innovation introduced by ORBEET and was validated in the  pilot sites of the project, with results highlighting the need for the adoption of a holistic and systemic approach in building management, considering also occupancy related parameters on the operational process.\nMoreover, an important lesson learned during the project is that building occupants need to be specially treated towards the establishment of the concept. ORBEET attempted to involve the building occupants in the project activities from the early implementation phase and through a series of workshops, demonstrations of the captured data, along with the way these were treated, anonymized, processed and stored, the project partners achieved high acceptance rates among the occupants that were directly involved in the project. \n\nFollowing the evaluation process in 4 different pilot sites, a summary of OrbEEt impact towards the implementation of energy efficiency strategies is provided:\n\nOrbEEt Impact Achieved During the Project\nOverall Energy Demand Reduction = 19.0 %\n\u2022\tPeak Demand Reduction = 23.0 %\n\u2022\tOverall Reduction on CO2 emissions\t = 25.0 %\n\u2022\tConsumer Engagement and Willingness to participate \u003E 90%\n\u2022\tEngagement of externals in the project\u2019s social media channels, events, workshops, open days = over 50.000 individuals\n\nDuring the lifespan of the project, emphasis has been put on the dissemination strategy and methodology in order to encourage the use of foreground and the uptake of the project\u2019s outcomes and consequently to maximize industrial and societal impact. \n\nIt should be noted that OrbEEt dissemination plan was not static. On the contrary, it has been often updated as new opportunities for dissemination appeared. Following reviewers\u2019 recommendation during the first project review we expanded the dissemination channels and activities performed towards the dissemination of project results. The level of dissemination spans from local workshops and demo events, participation in events and conferences, scientific publications etc.\u2026 as reported in D5.2, D5.8, and D5.9 respective; summary provided in the following section.","periodNumber":"2","periodFrom":"2016-09-01","periodTo":"2018-02-28","reportTypeDescription":"Periodic Reporting for period 2","identifiers":{"reportId":"61508"},"sourceUpdateDate":"2024-02-24 10:47:00","contentCreationDate":"2017-02-16 15:41:40","contentUpdateDate":"2024-04-01 17:42:44","lastUpdateDate":"2024-04-01 17:43:11","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"194615","id":"649753","acronym":"OrbEEt","title":"ORganizational Behaviour improvement for Energy Efficient adminisTrative public offices","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/11936537\/91827000","title":"climatic change mitigation","displayCode":"\/engineering and technology\/environmental engineering\/ecosystem-based management\/climatic change mitigation","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/75\/471","title":"thermodynamic engineering","displayCode":"\/engineering and technology\/mechanical engineering\/thermodynamic engineering","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/73\/453\/58525161","title":"sensors","displayCode":"\/engineering and technology\/electrical engineering, electronic engineering, information engineering\/electronic engineering\/sensors","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/29\/101\/559\/1375","title":"crisis management","displayCode":"\/social sciences\/sociology\/governance\/crisis management","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"RIA","title":"Research and Innovation action","description":"Research and Innovation action","displayCode":"\/Research and Innovation action","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664321","id":"H2020-EU.3.3.","code":"H2020-EU.3.3.","frameworkProgramme":"H2020","pga":"H2020-EU.3.3.","title":"SOCIETAL CHALLENGES - Secure, clean and efficient energy","shortTitle":"Energy","parent":{"rcn":"664235\/664087\/664086","code":"H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664323","id":"H2020-EU.3.3.1.","code":"H2020-EU.3.3.1.","frameworkProgramme":"H2020","pga":"H2020-EU.3.3.1.","title":"Reducing energy consumption and carbon foorpint by smart and sustainable use","shortTitle":"Reducing energy consumption and carbon footprint","parent":{"rcn":"664321\/664235\/664087\/664086","code":"H2020-EU.3.3.\/H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"664688","id":"H2020_EE-11-2014","code":"EE-11-2014","frameworkProgramme":"H2020","title":"New ICT-based solutions for energy efficiency","parent":{"rcn":"20200","code":"H2020-Topics"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","availableLanguages":"en","code":"31051375","title":"Information and communication technologies","displayCode":"\/Information and communication technologies","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049263","title":"Energy end-use efficiency and energy services","displayCode":"\/Energy end-use efficiency and energy services","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049252","title":"Energy efficient products","displayCode":"\/Energy efficient products","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049223","title":"Energy efficient buildings","displayCode":"\/Energy efficient buildings","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"corda","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/01323-orbeet-logo-01.png","alternativeText":"Project_logo","mimetype":"image\/png","size":"133120","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/orbeet-demo-austria-final-001.jpg","alternativeText":"OrbEEt_DemoHistories_Australia_01","mimetype":"image\/jpeg","size":"638976","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/orbeet-poster-001.jpg","alternativeText":"OrbEEt_first_Poster","mimetype":"image\/jpeg","size":"532480","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/orbeet-demo-austria-final-003.jpg","alternativeText":"OrbEEt_DemoHistories_Australia_03","mimetype":"image\/jpeg","size":"628736","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/orbeet-demo-spain-final-001.jpg","alternativeText":"OrbEEt_DemoHistories_Spain_01","mimetype":"image\/jpeg","size":"606208","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/orbeet-final-poster.jpg","alternativeText":"OrbEEt_final_Poster","mimetype":"image\/jpeg","size":"448512","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/orbeet-demo-spain-final-002.jpg","alternativeText":"OrbEEt_DemoHistories_Spain_02","mimetype":"image\/jpeg","size":"620544","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/orbeet-brochure-vdery.png","alternativeText":"OrbEEt_Brochure","mimetype":"image\/png","size":"1990656","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/orbeet-demo-austria-final-002.jpg","alternativeText":"OrbEEt_DemoHistories_Australia_02","mimetype":"image\/jpeg","size":"651264","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/649\/649753_PS\/eu-projects-min.png","alternativeText":"Join_EU_Projects","mimetype":"image\/png","size":"598016","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en","defaultLanguage":"en","id":"a34e3684fdcf59fb371d6a3faec5cb3f","archivedDate":"2025-06-20 00:00:00","physUrl":"http:\/\/www.orbeet.eu","status":"legacy","contenttype":"webLink","attributes":{"represents":"project","source":"corda","type":"relatedWebsite"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}