{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"202058","id":"730668_PS","title":"Periodic Reporting for period 3 - PINTA (IP1 Traction TD1 and Brakes TD5 \u2013 Phase 1)","teaser":"This project has been developed as Phase 1 of the work which will be developed within the Technical Demonstrators Traction (TD1.1) and Brakes (TD1.5) during the implementation of Shift2Rail.The ultimate goals of TD Traction and TD Brakes are, from one side to bring to   the...","description":"periodic","summary":"This project has been developed as Phase 1 of the work which will be developed within the Technical Demonstrators Traction (TD1.1) and Brakes (TD1.5) during the implementation of Shift2Rail.\nThe ultimate goals of TD Traction and TD Brakes are, from one side to bring to   the market a new generation of traction drive equipment and, on the other side, to develop safe brake systems  based on adhesion management with higher braking performance, lower life cycle cost and noise levels.\nThe project PINTA addresses the topic S2R-CFM-IP1-01-2016  \u2013Development of concepts towards the next generation of traction systems and management of wheel\/rail adhesion \u2013of the first H2020-S2R Call for project for the JU members.\n\nOn year 3, the partners have continued to progress toward the 7 Traction KPIs targets described in WP1 Deliverable. Once a year, partners will deliver their respective progress on the 7 KPIs.\nBrake Adhesion work done in WP7,8 have also described their local KPIs.\nAll of them are fully in line with S2R macro KPIs ( LCC, Reliability\/Avvailability, Capcity of trains or lines)\nPINTA Phase 1 project has been closed end of Dec 2018.\nWork are continued via S2R IP1 PINTA2 project and keep the same targets to lead to demonstrations on trains at the end of S2R","workPerformed":"On Year2, the main results per Workpackage are: \n\u2022\tWP1 Top level requirements\nThe Top level specifications have been updated and refined including the Operators (DB,SNCF) points of view.\n\u2022\tWP2 Development of lab prototypes\nTramway: The design of a SiC traction converter for Tramway application has been done and described in Draft D2.1 (24pages) .\nMetro: The design of a SiC traction converter for Metro application.\nSub-urban : The design of a Sub-Urban Lab converter Hardware has been done.\nRegional: \nElectronic-Transformer Regional: The general studies on e-transfo pre-implantation of train roof have been done.\n Traction SiC Regional: the first evaluation of 7 Traction KPIs achievement  has been quantified.\nThe main benefits are the reduction of energy consumption and maintenance savings.\nThe exchanges with operator about traction SiC demonstration within Shift2Rail timeframe have started. The prototype of power module has been realized for electrical tests.The prototype of gearbox has been realized.\n\nRegional Traction system smart maintenance: The state of situation in Traction Regional trains and axes of work for predictive maintenance algorithms has been described.\nHST :  \nThe specification for the traction motor has been delivered.\n\u2022\tWP3 Tools and methodologies to reduce noise and EMI emission\nThe main work has been on different axes of study aiming to better simulate and reduce noise from different origins, Progress has been done on methodologies of cooling noise of traction motors,.\nOn EMI noise reduction , The preliminary definition, development, application and validation of methodologies and tools for the simulation of EMI emission of traction systems has been studied.\n\u2022\tWP4 Tools and methodologies for increased reliability, availability and smart maintenance. \nOn the improvement  of knowledge of power components for higher reliability, additional informations of environmental conditions inside the electronic compartment based on existing measurements were described, mission profiles for electrical stress of related semiconductors were described.\nOn the improvement of concepts and architectures for higher availability: the definition of optimized system architecture for the different vehicle platforms, the evaluation of existing and additional sensors to create information for improvement of availability have been done.\n\u2022\tWP5 Requirements, specifications and developments for virtual validation and certification.\nPhysical tests which may be replaced by virtual simulations have been identified.\nGood correlation between virtual simulations and real measurements for component and on-vehicle tests was achieved.\n\u2022\tWP6 Supply standardisation for key components \u0026 technology transfer.\nThe standard semiconductor specification has been updated.\n\u2022\tWP7 Adhesion detection and low adhesion management \nDuring two measurement campaigns in the course of commissioning of an Alstom Regiolis as well as an Alstom Pendolino train Faiveley and Knorr-Bremse recorded adhesion relevant data.\n\u2022\tWP8 Adhesion modeling and laboratory \u0026 track reproduction systems\nThe Adhesion modeling specification, the WSP test procedure, the WSP Test rig specification specification have been described. \n\n\u2022\tWP9 Project Management and Technical Coordination\nThe WP9 has continued to organize internal to PINTA governance meetings. The Proposal to continue PINTA on a \u201cPINTA2\u201d future project - based on AWP 2018- has been prepared . The 2nd Interim Paiement has been received and distributed to PINTA partners\n\n\u2022\tWP10 Dissemination, communication and exploitation\nTwo papers have been submitted and accepted for Transport Research Arena conference on April 2018; the communication of PINTA at Innotrans 2018 discussed and concrete proposals have been done to the JU S2R; the PINTA Brochure has been released","finalResults":"The ambitions of Shift2Rail which are inherited by PINTA require substantial ground-breaking improvements in the two key vehicle technology areas addressed by the Project. Indeed, current vehicle solutions are getting closer to their enhancement limits and new radical proposals must be envisaged to accomplish the goals.","periodNumber":"3","periodFrom":"2018-01-01","periodTo":"2018-12-31","reportTypeDescription":"Periodic Reporting for period 3","identifiers":{"reportId":"130285"},"sourceUpdateDate":"2019-12-25 10:59:52","contentCreationDate":"2017-08-16 17:28:30","contentUpdateDate":"2019-12-25 10:59:52","lastUpdateDate":"2025-01-28 17:14:53","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"205482","id":"730668","acronym":"PINTA","title":"IP1 Traction TD1 and Brakes TD5 \u2013 Phase 1","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"en","code":"RIA","title":"Research and Innovation action","description":"Research and Innovation action","displayCode":"\/Research and Innovation action","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664357","id":"H2020-EU.3.4.","code":"H2020-EU.3.4.","frameworkProgramme":"H2020","pga":"H2020-EU.3.4.","title":"SOCIETAL CHALLENGES - Smart, Green And Integrated Transport","shortTitle":"Transport","parent":{"rcn":"664235\/664087\/664086","code":"H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"en","rcn":"700128","id":"H2020-EU.3.4.8.1.","code":"H2020-EU.3.4.8.1.","frameworkProgramme":"H2020","pga":"H2020-EU.3.4.8.1.","title":"Innovation Programme 1 (IP1): Cost-efficient and reliable trains","parent":{"rcn":"700520\/664357\/664235\/664087\/664086","code":"H2020-EU.3.4.8.\/H2020-EU.3.4.\/H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"700129","id":"H2020_S2R-CFM-IP1-01-2016","code":"S2R-CFM-IP1-01-2016","frameworkProgramme":"H2020","title":"Development of concepts towards the next generation of traction systems and management of wheel\/rail adhesion","parent":{"rcn":"20200","code":"H2020-Topics"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","availableLanguages":"en","code":"31049170","title":"Rolling Stock Engineering","displayCode":"\/Rolling Stock Engineering","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049172","title":"Certification, Verification, Validation, Technical Compliance, Standards","displayCode":"\/Certification, Verification, Validation, Technical Compliance, Standards","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049072","title":"Rail Transport","displayCode":"\/Rail Transport","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049133","title":"Rail interoperability","displayCode":"\/Rail interoperability","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"corda","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/730\/730668_PS\/alstom-3d-simulation-traction-case-wind-velocity.jpg","alternativeText":"3D simulation on new Traction equipments cooling on the roof of the train","mimetype":"image\/jpeg","size":"50993","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en","id":"3b62eaa24ca4187d5ff23382354ea1af","archivedDate":"2025-06-20 00:00:00","physUrl":"http:\/\/s2r.org","status":"legacy","contenttype":"webLink","attributes":{"represents":"project","source":"corda","type":"relatedWebsite"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}