{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"231707","id":"731796_PS","title":"Periodic Reporting for period 3 - PJ08 AAM (Advanced Airspace Management)","teaser":"PJ08 Advanced Airspace Management addresses the evolution of the Dynamic Airspace Configuration concept developed in SESAR 1, to further increase its maturity by enhancing the operational processes (ATM Network Operations, Service Providers and Airspace Users) and automated...","description":"periodic","summary":"PJ08 Advanced Airspace Management addresses the evolution of the Dynamic Airspace Configuration concept developed in SESAR 1, to further increase its maturity by enhancing the operational processes (ATM Network Operations, Service Providers and Airspace Users) and automated tools supporting Sector Design and Sector Configurations.\nThe definition of a new generation of Airspace Reservations, Dynamic Mobile Areas of Type 1 and Type 2 is also addressed.\n\nOverall objectives:\nPJ08 AAM addresses the following objectives: \n- Enhance functions that support ATC airspace configuration and management, dynamically adapted to AUs\u2019 demand in response to changes in traffic patterns and\/or short term changes in environment and users\u0027 intentions\n- Develop and validate Flexible Airspace designed for long term planning, to predict the resources needed for meeting the forecasted AUs\u2019 traffic needs\n- Develop and validate the definition of a new generation of Airspace Reservation, the DMAs. For the needs of Military Users, the DMAs are temporary volumes of airspace designed to separate the military activities performed inside (themselves) from civil traffic\n- Integrate DAC concept and process into other ATM processes (DCB) to improve ATM Network performance. Applicability at Regional, Sub-regional, and Local levels.\n\nImportance for Society: \nPJ08 AAM benefits are expected to improve Capacity, Cost-effectiveness (cost of Air Navigation for resource planning and Network Management) and flexibility for AUs, potentially turning into cost savings.","workPerformed":"\u0022PJ08 progressed through 2 Solutions. Status described here below:\n\nSolution 1 aims at achieving V2 maturity level by end of S2020 Wave 1. Its activities progressed according to the PJ08 PMP principles\nV2 concept developments related to DAC, new Military Airspace DMAs type 1 and 2 and their use into a Collaborative process, progressed in line with the Project Schedule\n\nRP1\nInitial Validation, Safety Assessment, Human Performance Assessment Plans, Performance Assessment Report, and Initial Technical requirements delivered Jul-Nov 2017\nFirst Validation Exercise (exploring new opportunities for ANSPs on airspace design techniques) took place in 2017\n\nAchievements: Performance assessment (EXE#1) led by ENAV, demonstrated higher flexibility provided by new Airspace Design methodology (DAC based). Expected benefits from DAC in Free Route environment (increase of en-route Capacity) confirmed, correct flights\u0027 re-routing impacted by DMA activation. Fuel burn assessment to be completed by end February 2018\n\nRP2\nSolution progressed in 2018 according to the PMP. Intermediate OSED, VALP and TS\/IRS delivered early Oct to SJU\n\nAchivements: In Mar, a second Performance Assessment activity (EXE#4) was completed by ECTL. In May, SINTEF and ENAV completed the first validation human-in-the loop (EXE#6): initial evaluation of DAC concept from ATCOs perspective. In Oct-Nov, DSNA completed the second validation human-in-the-loop (EXE#5): Operational feasibility of DAC concept in INAP time horizon, and ops acceptance of DAC services to support sectors configuration optimization\n\nRP3\nSolution progressed in 2019 according to the PMP. OSED, TS\/IRS, VALR, and CBA completed and delivered to SJU for Quality Assessment and preparation of Maturity Gate\n\nAchievements: two activities validating the DAC Collaborative full process completed in Apr (EXE#2) and Jun (EXE#3). In Jul, V2 Datapack submitted for official SJU Quality Assessment. In Oct, final V2 Datapack approved for Maturity Gate. V2 Gate took place in Nov: Solution 1 fully achieved its V2 maturity objective\n\n\n\nSolution 2 aims at achieving a very initial V1 maturity level by end of S2020 Wave 1. \nThe only task of this Solution is develop Moving Hazard Zones\u2019 assessment study that evaluates MET Gate data content, to be used to determine the initial implementation of the MHZ concept. The assessment also focuses on the state of the DAC concept providing recommendations for Wave 2\n\n\nRP1\nThe activity started in Q4 2017 and proceeded according to the PMP \n\nAchievement: initial draft produced by end 2017.\n\nRP2\nSolution progressed in 2018 according to the PMP. A major change was introduced (agreement from Project Coordinator, Solution Leader, Partners, and SJU PM): a Gate allowing for a light assessment (v1 on-going maturity) of the results, to be run in 2019. This was reflected in the PMP. Study planned to be completed by March 2019\n\nAchievement: Intermediate Study completed and submitted to SJU in Sep: new Operating Methods on MHZ integration with the DAC and mgt defined. A prototype for a trial (tool for experts\u0027 judgement) was developed\n\nRP3\nThe Solution progressed in 2019 according to the PMP. A light maturity assessment (v1 on-going level) based on results\u0027 self-assessment was run\n\nMain Achievement: final version of the Study completed and submitted to SJU in March 2019: that document contained the envisaged operational setup of the MHZ concept, process automation concept and preliminary definition of other operational characteristics. It addressed the MET Gate data content to be evaluated, in order to determine the scope of the initial implementation of the concept. The assessment focused on the state of the DAC framework providing necessary recommendations for Wave 2.\u0022","finalResults":"Key results obtained by end of PJ08: \n\nInitial INAP Process integrated with DAC concept\nInitial ATCO assessment of DAC\nInitial DAC concept at V2 maturity\nIntegrated DAC and DMAs at V2 maturity\t\n\nPerformance\nSolution 1\nCivil-Military Coordination: Military ops training capabilities remain unchanged by application of DMA principles. CDM processes provide opportunities to reduce transit times in military missions. Impact on civil traffic rerouting reduced when using DMA Type 2, decrease in total number of impacted flights compared to ARES and gain for individual flights (distance, fuel and time)\nOps feasibility: Concept recognised to enhance predictability \u0026 flexibility, thus improving today\u2019s ops. All actors confirmed preference for the decentralized model. Evidence of DAC ops feasibility for dynamic sectors configurations (within INAP time horizon). Considerable time saving thanks to the automated tool on detection, resolution and decision making for the management of sectors configurations. Feasibility of ATC ops procedures in no predefined sector configurations confirmed\nSolution 2\nIntroduction of MHZ type 1 and 2 into complexity\/workload\/trajectory calculations directly affecting simulated sector capacity\n\nGeneral\nSolution 1 In tactical ops and at ACC level, it is possible to get rid of predefined sectors\u2019 configuration\nSolution 1 Gaming, Human-in-the-loop and Real-time simulations: positive feedback from the actors (ops feasibility, procedures, workload and situational awareness of DAC concept, including FRA environment). DAC improved resources mgt on the day of operations, as well as predictability and flexibility\nSolution 1 Early implementation of some mature DAC concept elements in Bordeaux ACC (France)\nSolution 2 ASM and FMP could perform their work well and according to procedures. Issues may raise if military actor reserves airspace that does not contain weather hazards leaving civil airspace users to fly in airspace containing weather hazards. This calls for weather-aware FMP\u2013ASM, and MHZ type 1 (maybe also type 2) would be an excellent tool for it. To be included in the DAC CDM process to make it more robust.","periodNumber":"3","periodFrom":"2019-01-01","periodTo":"2019-12-31","reportTypeDescription":"Periodic Reporting for period 3","identifiers":{"reportId":"152312"},"sourceUpdateDate":"2020-06-02 20:31:25","contentCreationDate":"2018-06-15 12:49:13","contentUpdateDate":"2020-06-02 20:31:25","lastUpdateDate":"2022-08-17 18:15:23","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"206246","id":"731796","acronym":"PJ08 AAM","title":"Advanced Airspace Management","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/75\/461\/1239\/1737","title":"aircraft","displayCode":"\/engineering and technology\/mechanical engineering\/vehicle engineering\/aerospace engineering\/aircraft","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/425","title":"energy and fuels","displayCode":"\/engineering and technology\/environmental engineering\/energy and fuels","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/29\/99\/547\/1339\/1761","title":"air traffic management","displayCode":"\/social sciences\/social geography\/transport\/transport planning\/air traffic management","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"SESAR-RIA","title":"Research and Innovation action","description":"Research and Innovation action","displayCode":"\/Research and Innovation action","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664357","id":"H2020-EU.3.4.","code":"H2020-EU.3.4.","frameworkProgramme":"H2020","pga":"H2020-EU.3.4.","title":"SOCIETAL CHALLENGES - Smart, Green And Integrated Transport","shortTitle":"Transport","parent":{"rcn":"664235\/664087\/664086","code":"H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"en","rcn":"680827","id":"H2020-EU.3.4.7.","code":"H2020-EU.3.4.7.","frameworkProgramme":"H2020","pga":"H2020-EU.3.4.7.","title":"SESAR JU","parent":{"rcn":"664357\/664235\/664087\/664086","code":"H2020-EU.3.4.\/H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"700620","id":"H2020_SESAR.IR-VLD.Wave1-10-2015","code":"SESAR.IR-VLD.Wave1-10-2015","frameworkProgramme":"H2020","title":"Advanced Airspace Management","parent":{"rcn":"20200","code":"H2020-Topics"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","availableLanguages":"en","code":"31049573","title":"AMG Airspace Management","displayCode":"\/AMG Airspace Management","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"corda","type":"relatedProject"}},{"language":"en","availableLanguages":"en","id":"fc85042c870ea26990bc70bc7aa55ed4","archivedDate":"2025-07-03 00:00:00","physUrl":"https:\/\/www.sesarju.eu\/projects\/aam","status":"legacy","contenttype":"webLink","attributes":{"represents":"project","source":"corda","type":"relatedWebsite"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}