{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"233258","id":"755615_PS","title":"Periodic Reporting for period 5 - VALEMA (VALidation tests of ElectroMechanical Actuators and its dedicated control units at TRL 6 level)","teaser":"The VALEMA Project, within the Clean Sky 2 programme, follows two main objectives.\u2022 To manufacture and assemble optimized and reliable innovative Electro-Mechanical Actuators (EMAs), and their dedicated Electronic Control Units (ECUs) for Aileron\/Spoiler (A\/S) flight control...","description":"periodic","summary":"The VALEMA Project, within the Clean Sky 2 programme, follows two main objectives.\n\u2022 To manufacture and assemble optimized and reliable innovative Electro-Mechanical Actuators (EMAs), and their dedicated Electronic Control Units (ECUs) for Aileron\/Spoiler (A\/S) flight control surfaces actuation and for winglet\/flap-tab surfaces actuation that were previously designed and developed in EMA4FLIGHT according to the GA N\u00ba 738042 (Development of Electromechanical Actuators and Electronic Control Units for Flight Control Systems). These Motor, ballscrew and mechanical parts\/ECU subsystems will be, in the future, boarded onto FTB2 Regional Aircraft IADP for their in-flight validation.\n\u2022 To perform certification activities regarding both the HW and SW of the ECUs in order to obtain a permit to fly in the FTB2 demonstrator of the Regional Aircraft.\nThe development of electromechanical actuation systems for aircrafts will help to achieve the objectives set by ACARE for the aeronautics industry as they will reduce the weight of the aircrafts enabling a consumption reduction. The designed sub-systems are improved by electric motor and ballscrew innovative architecture, advanced control strategies and smart safety, diagnostic and maintenance functions.\nTo summarize the manufacturing objective, 10 Flap-tab ECU units have been delivered to the Topic Manager (TM), as well as 3 EMA units for the Aileron System, 7 EMA units for the Spoiler System, 11 SHA units for the Aileron System, 6x Roll Feel Units, motors and ballscrew for subsequent supply and integration into the Airbus DS Regional Ground Demonstrator.\nThe A\/S ECU hardware development failed and did not achieve the expected results within the time and efforts needed to support FTB#2 step 2. So, A\/S ECU HW and SW integration has not been finished. The knowledge acquired in HW and SW certification according to DO-254 and DO-178C for primary control surfaces actuation is planned to be exploited in other related projects with similarities.","workPerformed":"The work performed until the end of the Project is summarizes herein:\n\u2022 Manufacturing: The plans and requirements have taken into account the system requirements and the manufacturing routes have been analysed in order to optimize the manufacturing time, the raw material used and the environmental impact. The motor, ballscrews and Flap-Tab ECU have been manufactured and delivered to the TM for later supply and integration on Airbus DS Regional Ground Demonstrator.\n\u2022 HW certification: The PHAC generated within the EMA4FLIGHT project has been reviewed and updated and the records required for the certification is being collected. The PHAC has been formally approved by the Certification Liaison.\nThe development plans for the aileron\/spoiler ECU HW generated within EMA4FLIGHT have been reviewed and updated.\nThe test benches for the acceptance tests have been adapted.\n\u2022 SW certification: the development plans and standards generated within the EMA4FLIGHT project have been reviewed and updated. These plans and standards have been formally approved by the Certification Liaison.\nThe documentation and evidences for software requirements and preliminary design have also been generated and approved by the Certification Liaison. These elements have been updated and internally approved for the critical design review.\nAdditionally, several tasks for testing and formal verification of the source code have been performed.\nA\/S ECU hardware development has failed and will not achieve the expected results within the time and efforts needed to support FTB#2 step 2. So, A\/S ECU HW and SW integration has not been finished. TM proposed to develop an alternative A\/S ECU, as mitigating action included in TM GAM, after having been agreed by JU and Airbus DS to support FTB#2 step 2.\n\nDissemination \u0026 communication activities performed from the beginning of the project are:\n\u2022 UMBRA paper about electrical motor designed for EMA4flight and VALEMA projects. Conference IECON 2019, Lisbon, Portugal, October 14-17, 2019\n\u2022 GMV has generated 3 articles in internal magazine, GMV NEWS: Apr 2017, Dec 2017 and Nov 2019.\n\u2022 Article in TECNALIA web page. April 3,2020\n\u2022 GMV has prepared an article for AerospacheTechReview.com. \u201cCritical SW Application at High Speeds Featuring a Digital Signal Processor (DSP)\u201d, December 2021\n\u2022 TECNALIA participation in R3ASC\u201918. May 30- June 1,2018, Toulouse. TECNALIA presented one Poster\n\u2022 GMV has included a mention to the VALEMA project in its 2020 yearly report.\n\u2022 SKYLIFE has created a web page\n\u2022 GMV website\n\nThe achieved results are expected to be mature enough for implementation by TM in a flight demonstrator via its own development programme. \nFor the flap tab ECU, the expected exploitable result will be probably a new HW revision of the ECU with minor or major changes function of the results of the ground and flight tests being conducted by the TM and the CS2JU Member (Airbus DS). Shall this exploitation opportunity occur, a dedicated agreement in written shall be signed between both parties.\nLimited possibilities to exploit results for A\/S ECU HW or SW once the ECU will not be produced. Anyhow GMV and TECNALIA plan to use SW and HW, respectively, with similarities to the ones developed here in other related projects.\nThe experience acquired in VALEMA reinforces and consolidates RAMEM\u0027s knowledge in mechanical manufacturing and improves RAMEM\u0027s positioning to win future contracts for the manufacture of this type of components.\nGMV has improved its skills in HW and SW certification for critical systems (DAL-A). GMV will use the experience gained in critical hardware and software certification in future aeronautics programmes.","finalResults":"The new actuation systems will help the reduction of emissions of the aircrafts due to the reduction on the overall weight of the aircraft, therefore, contributing to reach the goals set by ACARE for the aeronautic industry in 2050. The developed ECU, motor and ballscrews for aileron spoiler subsystems and the flap tab ECU will contribute to weight savings and therefore, to a greener aviation.\nNew actuation systems or generated knowledge in advanced control strategies and smart safety, diagnostic and maintenance functions enable an increase of the competitiveness of all companies of the VALEMA consortium and the TM in the Electric Aircraft sector.\nFor the flap tab ECU, the expected exploitable result will be probably a new HW revision of the ECU with minor or major changes function of the results of the ground and flight tests being conducted by the TM and the CS2JU Member (Airbus DS).\nGlobal impact at platform level, as estimated by the platform integrator (Airbus DS) for the Demonstrator D4-ET1: 43% CO2 and 70% NOx reduction; 45% noise reduction during take off; improvement of reliability and life cycle cost; increased health monitoring. The Demonstrator D4-ET1 is responsibility of the Topic Manager and includes parts manufactured and delivered in VALEMA.","periodNumber":"5","periodFrom":"2021-05-01","periodTo":"2022-07-31","reportTypeDescription":"Periodic Reporting for period 5","identifiers":{"reportId":"249572"},"sourceUpdateDate":"2022-12-11 12:45:09","contentCreationDate":"2018-06-29 10:23:10","contentUpdateDate":"2022-12-16 18:00:02","lastUpdateDate":"2024-04-02 20:08:19","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"211049","id":"755615","acronym":"VALEMA","title":"VALidation tests of ElectroMechanical Actuators and its dedicated control units at TRL 6 level","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/23\/47\/307","title":"software","displayCode":"\/natural sciences\/computer and information sciences\/software","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/73\/453\/457","title":"control systems","displayCode":"\/engineering and technology\/electrical engineering, electronic engineering, information engineering\/electronic engineering\/control systems","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/75\/461\/1239\/1737","title":"aircraft","displayCode":"\/engineering and technology\/mechanical engineering\/vehicle engineering\/aerospace engineering\/aircraft","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/21\/33\/121\/51870878\/44109686\/619","title":"HIV","displayCode":"\/medical and health sciences\/health sciences\/infectious diseases\/viral diseases\/RNA viruses\/HIV","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/425","title":"energy and fuels","displayCode":"\/engineering and technology\/environmental engineering\/energy and fuels","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"IA","title":"Innovation action","description":"Innovation action","displayCode":"\/Innovation action","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664357","id":"H2020-EU.3.4.","code":"H2020-EU.3.4.","frameworkProgramme":"H2020","pga":"H2020-EU.3.4.","title":"SOCIETAL CHALLENGES - Smart, Green And Integrated Transport","shortTitle":"Transport","parent":{"rcn":"664235\/664087\/664086","code":"H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"en","rcn":"665414","id":"H2020-EU.3.4.5.6.","code":"H2020-EU.3.4.5.6.","frameworkProgramme":"H2020","pga":"H2020-EU.3.4.5.6.","title":"ITD Systems","parent":{"rcn":"665402\/664357\/664235\/664087\/664086","code":"H2020-EU.3.4.5\/H2020-EU.3.4.\/H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"702273","id":"H2020_JTI-CS2-2016-CFP04-SYS-02-22","code":"JTI-CS2-2016-CFP04-SYS-02-22","frameworkProgramme":"H2020","title":"Validation tests of electromechanical actuators and its dedicated control units at TRL 6 level","parent":{"rcn":"20200","code":"H2020-Topics"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","availableLanguages":"en","code":"31049508","title":"Aircraft Avionics, Systems \u0026 Equipment AVS","displayCode":"\/Aircraft Avionics, Systems \u0026 Equipment AVS","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"corda","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/755\/755615_PS\/201909-e4f-pr2.png","alternativeText":"Scope of VALEMA project","mimetype":"image\/png","size":"251904","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en","defaultLanguage":"en","id":"b89bd9a4177fa276fc4c95ae11b4a4b5","archivedDate":"2025-07-08 00:00:00","physUrl":"https:\/\/www.gmv.com\/en-es\/about-gmv\/get-know-company\/rdi-aid\/valema","status":"legacy","contenttype":"webLink","attributes":{"represents":"project","source":"corda","type":"relatedWebsite"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}