CORDIS
EU research results

CORDIS

English EN
Simulation using Building Information Modeling Methodology of Multimodal, Multipurpose and Multiproduct Freight Railway Terminals Infrastructures.

Simulation using Building Information Modeling Methodology of Multimodal, Multipurpose and Multiproduct Freight Railway Terminals Infrastructures.

Periodic Reporting for period 1 - INTERMODEL EU (Simulation using Building Information Modeling Methodology of Multimodal, Multipurpose and Multiproduct Freight Railway Terminals Infrastructures.)

Reporting period: 2016-09-01 to 2018-02-28

BIM Model Melzo Terminal

Project information

Grant agreement ID: 690658

Status

Ongoing project

  • Start date

    1 September 2016

  • End date

    31 August 2019

Funded under:

H2020-EU.3.4.

  • Overall budget:

    € 2 999 547,50

  • EU contribution

    € 2 999 547,50

Coordinated by:

IDP INGENIERIA Y ARQUITECTURA IBERIA SL