{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"264047","id":"754059_PS","title":"Periodic Reporting for period 2 - Fit-to-nZEB (Innovative training schemes for retrofitting to nZEB-levels)","teaser":"Reaching of the 2020 and 2030 energy and climate change objectives represents a major challenge to the construction sector, which needs to be ready to deliver high energy performing renovations and, in particular, nearly zero energy buildings. This goal requires a major effort...","description":"periodic","summary":"Reaching of the 2020 and 2030 energy and climate change objectives represents a major challenge to the construction sector, which needs to be ready to deliver high energy performing renovations and, in particular, nearly zero energy buildings. This goal requires a major effort to increase the number of qualified construction specialists at all levels, which is directly related to the accessibility and quality of the educational programmes and the inclusion of training on intelligent EE and RE solutions in building renovation. To address this need, the Fit-to-NZEB project aims to increase the competence and skills of the building professionals in all participating countries - Czech Republic, Romania, Bulgaria, Italy, Croatia, Ireland, Austria and Greece - through unique educational programmes and pilot training courses, which will contribute to both the quality and the scale of the deep energy building renovations. The project has produced all necessary requisites for the introduction of educational content on deep energy retrofit in the curricula at all levels of the vocational training and education system, including: \n1) module-based training programmes, available for use by any interested vocational training and education provider. \n2) Innovative training facilities: being strongly focused on practical training, the project has not only developed a set of practical exercises, but has designed and produced dedicated retrofit practical training and demonstration models\nIn order to meet its overarching goal to increase the number of qualified construction specialists at all levels, the project has set as its specific objectives: \n1.\tTo develop a compendium of the knowledge, skills and competences required for deep energy information\nBased on the compendium, to develop:\n2.\tA design-focused training programmes on deep energy building renovation for higher education establishments (EQF level 6-7) \n3.\tA training programme on deep energy building renovation, to be included in the training plans and programmes for the tradesperson  professions in \u201cConstruction\u201d professional direction \n4.\tTraining content, to be included in the training plans and programmes for the professions in \u201cMechanical engineering\u201d professional direction \n5.\tTwo training programmes for acquiring qualification on part of profession (specialization, or similar qualification according to each national qualification framework), to be used in the training plans of the VTCs (EQF level 3-4) \n6.\tA comprehensive scheme for validating of knowledge, skills and competences acquired at the workplace (EQF level 3-4). \n7.\tTo disseminate the educational content on deep energy building renovation at nation-scale level\n8.\tTo develop the design of demonstration and practical training models, to actually build one such model for the use of the training centers providing the trainings, and to specify the equipment and building materials necessary for practical training and demonstrations \n9.\tTo conduct a train-the-trainer course for selected trainers from the supporting educational and training institutions and to organize\n10.\tTo conduct a systematic large-scale communication campaign promoting the new training courses.","workPerformed":"In order to maximise its impact, the project has prudently used the training and communication infrastructure of its predecessor Train-to-NZEB (www.train-to-nzeb.com), which already operates 5 training centers (Building Knowledge Hubs) in Eastern and Southern Europe. To this, added the capacity of 4 universities, 1 professional college and 4 VET training centers, participating as direct project partners, and attracted a number of new VET institutions in the BKH network. This has enabled Fit-to-nZEB to achieve the following results:\n- A full review of deep renovation training programmes and materials;\n- A set of learning outcomes on 17 topics related to deep energy retrofit, distributed according to the relevant EQF levels;\n- 7 model training programmes, ranging from Master programmes\u2019 classes to short-term upskilling courses;\n- Training materials on each of the 17 topics, including annotated presentations, exercises, examination questions and references;\n- Fully equipped training facilities in 7 European countries;\n- 180 newly trained trainers, capable to deliver the new training content using the practical training facilities;\n- 26 pilot courses conducted in universities, professional high schools and vocational training centers, involving 570 trainees; \n- 8 Memoranda of Understanding with education and training providers willing to use the new training programmes and materials;\n- A large and constantly growing network of dedicated professionals.","finalResults":"One of the Irish Fit-to-nZEB case studies (St. Bricin\u2019s park by Dublin City Council) was fully modelled in the Passive House Planning Package, PHPP. With a space heating demand of just 21 kWh\/m2.year, this project exceeded the stringent Passive House EnerPHit standard of 25 kWh\/m2.year by almost 20%. As worth noting, the EnerPHit level of airtightness required is 1.0 h-1, whereas the project achieved an impressive result of 0.6 h-1.  An adjacent apartment block, identical to the Fit-to-nZEB pilot, was refurbished a year previously. Primarily due to lack of training, they did not achieve a good level of airtightness on that earlier project, with an average between upstairs and downstairs of 4 air changes per hour @ 50 Pa. The implications for the space heating demand of this lesser level of airtightness are the staggering 50%: from 21 kWh\/m2.year to 31 kWh\/m2.year. And the improvements are visible \u2013 here\u2019s want some of the stakeholders\u2019 had to say: \n\nDublin\u2019s Lord Mayor, Nial Ring: \t\t\t\n\u201cwhat they\u2019ve achieved here in St. Bricin\u2019s is the gold standard in Passive Housing, but to do it in retrofit is even more extraordinary\u2026 it\u2019s an indication of what we should be doing\u201d\n\nDublin City Council Clerk of Works, Karl Payne:\t\nThe training \u201ctook a little bit of the mystery out of the idea of Passive House\u2026 each trade could see how it would be influencing another trade in terms of workmanship... the training was invaluable in meeting the quality goals of the project\u201d\n\nDublin City Council Executive Architect, Cecilia Naughton: \nThe training centred on \u201ctrying to solve the problems together\u2026 it became a team effort\u2026 we know you can do it, maybe we can help\u2026 it was very useful\u2026I\u2019m pleased that everyone is back living in their home again\u2026that\u2019s what the project is about really\u2026 \u201c \n\nWith a network of Building Knowledge Hubs currently active in 9 European countries \u2013 Bulgaria, Croatia, Czech Republic, Greece, Ireland, Italy, Romania, Turkey and Ukraine \u2013 the project team is willing and capable to replicate this success and to position itself as one of the most recognized NZEB training establishments, offering world-class upskilling courses sourced customized to the local needs and in collaboration with the construction industry. This, in no doubt, is a complex task requiring common efforts by policy makers, industrial and market actors, and the civil society, but in all cases, the BKH network will be an active part of the process, as our mission remains intact: to constantly increase the competence and skills of the building professional to deliver high quality nearly zero-energy buildings.","periodNumber":"2","periodFrom":"2018-06-15","periodTo":"2019-06-14","reportTypeDescription":"Periodic Reporting for period 2","identifiers":{"reportId":"118889"},"sourceUpdateDate":"2020-01-20 03:27:37","contentCreationDate":"2019-04-10 13:11:44","contentUpdateDate":"2020-01-20 03:27:37","lastUpdateDate":"2025-11-25 09:39:31","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"210594","id":"754059","acronym":"Fit-to-nZEB","title":"Innovative training schemes for retrofitting to nZEB-levels","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/425\/1169","title":"renewable energy","displayCode":"\/engineering and technology\/environmental engineering\/energy and fuels\/renewable energy","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/67\/11936537\/91827000","title":"climatic change mitigation","displayCode":"\/engineering and technology\/environmental engineering\/ecosystem-based management\/climatic change mitigation","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/75","title":"mechanical engineering","displayCode":"\/engineering and technology\/mechanical engineering","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/29\/97\/87917856\/1335","title":"civil society","displayCode":"\/social sciences\/political sciences\/political policies\/civil society","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/25\/77\/479\/1267\/1749","title":"sustainable building","displayCode":"\/engineering and technology\/civil engineering\/architecture engineering\/sustainable architecture\/sustainable building","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"CSA","title":"Coordination and support action","description":"Coordination and support action","displayCode":"\/Coordination and support action","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664321","id":"H2020-EU.3.3.","code":"H2020-EU.3.3.","frameworkProgramme":"H2020","pga":"H2020-EU.3.3.","title":"SOCIETAL CHALLENGES - Secure, clean and efficient energy","shortTitle":"Energy","parent":{"rcn":"664235\/664087\/664086","code":"H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664355","id":"H2020-EU.3.3.7.","code":"H2020-EU.3.3.7.","frameworkProgramme":"H2020","pga":"H2020-EU.3.3.7.","title":"Market uptake of energy innovation - building on Intelligent Energy Europe","shortTitle":"Market uptake of energy innovation","parent":{"rcn":"664321\/664235\/664087\/664086","code":"H2020-EU.3.3.\/H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664323","id":"H2020-EU.3.3.1.","code":"H2020-EU.3.3.1.","frameworkProgramme":"H2020","pga":"H2020-EU.3.3.1.","title":"Reducing energy consumption and carbon foorpint by smart and sustainable use","shortTitle":"Reducing energy consumption and carbon footprint","parent":{"rcn":"664321\/664235\/664087\/664086","code":"H2020-EU.3.3.\/H2020-EU.3.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"702017","id":"H2020_EE-14-2016-2017","code":"EE-14-2016-2017","frameworkProgramme":"H2020","title":"Construction skills","parent":{"rcn":"20200","code":"H2020-Topics"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","availableLanguages":"en","code":"31049238","title":"Vocational training","displayCode":"\/Vocational training","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31051364","title":"Energy Efficiency","displayCode":"\/Energy Efficiency","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31049223","title":"Energy efficient buildings","displayCode":"\/Energy efficient buildings","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"corda","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/img-20190316-105357.jpg","alternativeText":"Final Fit-to-nZEB conference in Milan, Italy","mimetype":"image\/jpeg","size":"61538","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/img-20181102-172020.jpg","alternativeText":"Airtightness materials\u0027 demonstration in Greece","mimetype":"image\/jpeg","size":"61538","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/56890319-686153055134068-7150400582472171520-o.jpg","alternativeText":"Examination at BKH-Bulgaria","mimetype":"image\/jpeg","size":"121768","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/55897104-686153175134056-4289985649332715520-n.jpg","alternativeText":"Practical training in Bulgaria","mimetype":"image\/jpeg","size":"590918","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/field-visit-nzeb-construction-site-communication-with-workers.jpg","alternativeText":"Field visit of Fit-to-NZEB studenst in Croatia","mimetype":"image\/jpeg","size":"706058","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/img-3461.jpeg","alternativeText":"School visits in BKH-Romania","mimetype":"image\/jpeg","size":"585939","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/picture6.jpg","alternativeText":"Practical training in Italy. Designed to allow reuse of materials","mimetype":"image\/jpeg","size":"121768","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/picture3.jpg","alternativeText":"Discussions on demo models in the Czech BKH","mimetype":"image\/jpeg","size":"463603","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/f08d7bd49603ebb044314246c2e80bb993e891035f17988f12-pimgpsh-mobile-save-distr.jpg","alternativeText":"How tough is the airtigthness tape? Gamification in BKH-Bulgaria","mimetype":"image\/jpeg","size":"246539","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/754\/754059_PS\/conducting-blower-door-during-excersises.jpg","alternativeText":"Pressurization test demonstration in Croatia","mimetype":"image\/jpeg","size":"76729","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en","id":"ef53421a44c1fba4826ef3f0f301de35","archivedDate":"2025-07-08 00:00:00","physUrl":"http:\/\/www.fit-to-nzeb.com","status":"invalid","contenttype":"webLink","attributes":{"represents":"project","source":"corda","type":"relatedWebsite"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}