{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"401900","id":"830036_PS","title":"Periodic Reporting for period 7 - Wavepiston (Competitive Wave Energy on Islands)","teaser":"Wavepiston is developed on the shoulders of the first-generation wave energy technologies. Due to its low weight, low-tech design, simple installation and operations \u0026 maintenance, Wavepiston will be the disruptive technology that can make wave energy competitive with the...","description":"periodic","summary":"Wavepiston is developed on the shoulders of the first-generation wave energy technologies. Due to its low weight, low-tech design, simple installation and operations \u0026 maintenance, Wavepiston will be the disruptive technology that can make wave energy competitive with the other renewable energy sources with the least disruption of the environment and no visual impact.\nOur prototype test and Phase I feasibility study have confirmed this potential. The Wavepiston system is easy to transport on 40\u2019 feet containers, is easy to assemble on site by local staff and can be deployed from a regular tugboat, just like operations and maintenance can be carried out without expensive specialists.\nIn the Phase 2 project, we will install a full-scale Wavepiston demonstration system in Gran Canaria to demonstrate the energy potential, durability and survivability ensuring a low cost per kWh.\nFrom a commercial point of view, our first goal is to contribute to decarbonization of islands and remote coastal areas, for which we already have interested clients at in the Carribean, Canary Islands, Sardinia, Marshall Islands, Philippines and the Maldives.","workPerformed":"The Phase 2 project plan is structured in 6 work packages as follows: \n-\tWP1 Management\n-\tWP2 Preparation for the full-scale demonstration\n-\tWP3 Manufacturing demonstration system and site installation\n-\tWP4 Demonstration and qualification\n-\tWP5 Business plan, commercial exploitation and dissemination.\n-\tWP6 Ethics requirements\n\nPre-installation installed and in operation December 2020 - March 2021. Detailed analysis on all parts completed. Input to updates to design and procedures.\n\nAll system components except energy collectors for full-scale system have been manufactured, assembled and installed.\n\nEnergy collectors have been manufactured and assembled, ready at mobilisation site.\n\nContinue with meetings with public and private stakeholders in relation to commercial projects to follow the demonstration in Gran Canaria. \n\nTwo granted patent families and new patents pending.\n\nWe have secured the required funding to continue the demonstration after oficial closure of the proejct to demonstrate results during 2024 and into 2025.","finalResults":"The overall project goal is to demonstrate the competitiveness of the Wavepiston system to supply clean electricity harvested from the energy in the waves. As we are testing at PLOCAN, an ocean platform located in an island (our targeted type of customer), we expect both to contribute and benefit from the interaction with local stakeholders, in terms of know-how for electricity and pre-commercial possibilities.\nThe highest environmental and social impact of the Wavepiston system: \n-\tLow visual impact: It cannot be seen from shore, except for the top of the 2 buoys\n-\tLow sound impact: It cannot be heard from shore.\nThe system can be in habited areas including tourist areas, an important source of income, hence visual and sound impact are important factors.\n-\tLow environmental impact: The patented innovation in our system compensates forces so the need of mooring and structural components are reduced significantly. This also reduces the weight per MW significantly.\nDuring Phase 2 more studies are taking place and measures being implemented to reduce impact to the sea ecosystem.\n-\tLow costs and low CO2 emission: Due to the low weight,  the design for automated manufacturing, and easy logistics, we can achieve a competitive cost level and have a very low initial CO2 impact.\n-\tAll of the above contributes for island and coastal communities as customers, usually dependent on the natural ecosystems, both at sea and land, to benefit from a clean, non-intrusive energy system compatible with local livelihoods.\n\nWavepiston has the potential for water desalination, which is being studied and tested in another project. This will add to local communities\u2019 welfare.\n\nRegarding economic potential impact, during the Phase 2 project we have prepared for the first commercial pilot farms in partnership with project developers (our customers).","periodNumber":"7","periodFrom":"2023-08-01","periodTo":"2024-03-31","reportTypeDescription":"Periodic Reporting for period 7","identifiers":{"reportId":"317613"},"sourceUpdateDate":"2024-08-22 01:43:58","contentCreationDate":"2019-08-16 11:46:47","contentUpdateDate":"2024-09-11 16:34:18","lastUpdateDate":"2026-01-06 15:24:29","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"en","rcn":"219029","id":"830036","acronym":"Wavepiston","title":"Competitive Wave Energy on Islands","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"en","code":"SME-2","title":"SME instrument phase 2","description":"SME instrument phase 2","displayCode":"\/SME instrument phase 2","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664235","id":"H2020-EU.3.","code":"H2020-EU.3.","frameworkProgramme":"H2020","pga":"H2020-EU.3.","title":"PRIORITY \u0027Societal challenges","shortTitle":"Societal Challenges","parent":{"rcn":"664087\/664086","code":"H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664223","id":"H2020-EU.2.3.","code":"H2020-EU.2.3.","frameworkProgramme":"H2020","pga":"H2020-EU.2.3.","title":"INDUSTRIAL LEADERSHIP - Innovation In SMEs","shortTitle":"Innovation in SMEs","parent":{"rcn":"664143\/664087\/664086","code":"H2020-EU.2.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis","uniqueProgrammePart":"true"}},{"availableLanguages":"de,en,es,fr,it,pl","rcn":"664145","id":"H2020-EU.2.1.","code":"H2020-EU.2.1.","frameworkProgramme":"H2020","pga":"H2020-EU.2.1.","title":"INDUSTRIAL LEADERSHIP - Leadership in enabling and industrial technologies","shortTitle":"Leadership in enabling and industrial technologies (LEIT)","parent":{"rcn":"664143\/664087\/664086","code":"H2020-EU.2.\/H2020-EC\/H2020"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"702705","id":"H2020_EIC-SMEInst-2018-2020","code":"EIC-SMEInst-2018-2020","frameworkProgramme":"H2020","title":"SME instrument","parent":{"rcn":"20200","code":"H2020-Topics"},"relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}},{"language":"en","availableLanguages":"en","code":"31051283","title":"Financial \u0026 Investment management","displayCode":"\/Financial \u0026 Investment management","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31086148","title":"Market-creating innovation","displayCode":"\/Market-creating innovation","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31051273","title":"Technology management","displayCode":"\/Technology management","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31051227","title":"Business management","displayCode":"\/Business management","attributes":{"classification":"topicKeyword","type":"isAbout"}},{"language":"en","availableLanguages":"en","code":"31051312","title":"IPR management","displayCode":"\/IPR management","attributes":{"classification":"topicKeyword","type":"isAbout"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"corda","type":"relatedProject"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/wavepiston-gc-assembly.jpg","alternativeText":"\u0022Pre-installation\u0022: Two energy collectors assembled","mimetype":"image\/jpeg","size":"1757184","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/230125-wavepistonunderwater-4-v3.jpg","alternativeText":"Illustration of the Wavepistron WEC 4","mimetype":"image\/jpeg","size":"292864","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/230125-wavepistonunderwater-1-v3.jpg","alternativeText":"Illustration of the Wavepistron WEC 1","mimetype":"image\/jpeg","size":"517120","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/img-20201016-wa0021.jpg","alternativeText":"\u0022Pre-installation\u0022: Two energy collectors launching at water 2","mimetype":"image\/jpeg","size":"295936","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/230125-wavepistonunderwater-2-v3.jpg","alternativeText":"Illustration of the Wavepistron WEC 2","mimetype":"image\/jpeg","size":"340992","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/230125-wavepistonunderwater-3-v3.jpg","alternativeText":"Illustration of the Wavepistron WEC 3","mimetype":"image\/jpeg","size":"411648","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/string-dec-2023.jpg","alternativeText":"Full-scale Wavepiston string installed at PLOCAN test site in Gran Canaria","mimetype":"image\/jpeg","size":"1949696","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/img-20201016-wa0015.jpg","alternativeText":"\u0022Pre-installation\u0022: Two energy collectors launching at water 1","mimetype":"image\/jpeg","size":"297984","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en,any","uri":"\/docs\/results\/h2020\/830\/830036_PS\/wavepiston-gc-pre-installation.jpg","alternativeText":"\u0022Pre-installation\u0022 system at the PLOCAN test site in Gran Canaria","mimetype":"image\/jpeg","size":"717824","contenttype":"webItem","attributes":{"source":"corda","type":"relatedResultAttachment"}},{"language":"en","availableLanguages":"en","defaultLanguage":"en","id":"03252d65163ab1cc3fb1f92f56ef05c1","archivedDate":"2025-07-08 00:00:00","physUrl":"http:\/\/www.wavepiston.dk","status":"legacy","contenttype":"webLink","attributes":{"represents":"project","source":"corda","type":"relatedWebsite"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}