{"contenttype":"result","language":"en","availableLanguages":"en","rcn":"47371","id":"31272_PS","title":"Final Report Summary - ARCHES (Assessment and rehabilitation of Central European highway structures)","teaser":"The strategic objective of the ARCHES project was to reduce the gap in the standard of highway structures between the Central and Eastern European Countries (CEEC), including New Members States (NMS), and the rest of the EU, in a sustainable way. This was planned to be achieve...","summary":"The strategic objective of the ARCHES project was to reduce the gap in the standard of highway structures between the Central and Eastern European Countries (CEEC), including New Members States (NMS), and the rest of the EU, in a sustainable way. This was planned to be achieved by developing appropriate tools and procedures for a more efficient assessment, and faster, cost-effective, and long lasting rehabilitations (repair or strengthening) of sub-standard highway structures.\n\nTo achieve its scientific and technological objectives, this project focused on structural assessment and monitoring, strategies to prevent deterioration and optimum rehabilitation of highway structures by complementary techniques. It was organised in four technical work packages (WP), with the following conceptual approach.\n- Optimise the use of existing infrastructure through better safety assessment and monitoring procedures which will avoid interventions, i.e. avoid unnecessarily replacing or rehabilitating structures that are in fact perfectly safe (WP2). The main objective of WP2 was to provide recommendations and guidance for implementation of optimised bridge assessment tools in NMS and CEEC. The recommendation will deal with monitoring, load testing of different types from soft load testing up to the proof one (experiment in Poland), dynamic impact on bridges and bridge management system development.\n- Monitor and prevent corrosion of existing reinforcement and develop innovative new reinforcement materials that are highly resistant to corrosion (WP3).\n- Strengthen the infrastructure of bridges by means of bonded reinforcements (WP4).\n- Harden highway structures with ultra high performance fibre reinforced concretes applied in severely exposed zones to dramatically increase their durability (WP 5).\n\nSite specific assessment of traffic loading has considerable potential to prove that bridges are safe which would otherwise have been rehabilitated or replaced. This is due to the conservatism of bridge standards that cover a wide range of possible traffic loading conditions throughout the road network. There is clearly a considerable gap between the complex mathematical modelling and experiments required for an accurate determination of dynamic allowance and the conservative values available at bridge codes. In order to reduce this gap, ARCHES proposes an intermediate solution based on the large amount of experimental tests and numerical simulations carried out during the project. The quality of the road profile plays a role that becomes more dominant as the span length decreases, but in the case of very good road profiles (ISO class A), the critical loading cases governing the maximum load effects typically produce dynamic amplification factors below 1.1. Nevertheless, the presence of a bump or a damaged expansion joint prior to the bridge may lead to higher values in short span bridges. Even so, it has been shown that exceptionally heavy vehicles representing critical loading cases such as cranes have a rigid configuration that generates smaller dynamics than typical five-axle articulated trucks. So, if the road profile of a bridge was maintained in a good condition, the dynamic amplification factor associated to the critical loading cases could be substantially reduced in relation to the values built within the Eurocode traffic load models.\n\nCathodic protection (CP) of reinforcing steel has been applied to concrete structures with corrosion damage for over 25 years. World wide experience shows that CP prevents further development of corrosion damage in a reliable and economical way for a long time, provided that the CP system is designed, executed and maintained properly. Based on case studies, the cost of CP over the (remaining) life of a structure has been investigated and compared to other options. Generalising, it appears that CP may be instrumental in saving considerable amounts of money over the remaining life of a structure, say over periods of 10 to 25 years.\n\nThe concept of rehabilitation of structures with UHPFRC was applied for the first time outside of Switzerland, in Slovenia with a new material designed from local components. The application was successful and fast (one month instead of three month with traditional technique) and demonstrated at an industrial scale the ability of the newly designed UHPFRC mixes to reply to the difficult challenges of the site. Applications with slopes up to 5 % at least are now possible, and by means of simple surfacing techniques it is possible to achieve uniform textured UHPFRC surfaces on which barefoot walking is possible. The newly designed recipes have a dramatically reduced cement content which makes them more economical and particularly attractive from an environmental point of view. This successful example of transfer of technology opens up very promising perspectives for the dissemination of the concepts of rehabilitation of civil infrastructures not only in NMS (which was the goal of the project ARCHES) but also in virtually any country.","sourceUpdateDate":"2017-02-14 12:07:21","contentCreationDate":"2011-10-24 00:00:00","contentUpdateDate":"2011-04-14 00:00:00","lastUpdateDate":"2020-09-25 14:25:41","archivedDate":"2024-06-23 00:00:00","relations":{"associations":[{"availableLanguages":"de,en,es,fr,it,pl","rcn":"87560","id":"87560-efficient-repair-of-road-infrastructure","title":"Efficient repair of road infrastructure","teaser":"The standard of highway structures such as bridges in Central European countries lags behind the rest of the Union. An EU-funded research project looked into how to assess, improve and repair such structures in the most efficient way.","contentUpdateDate":"2011-12-07 12:00:41","archivedDate":"2024-06-10 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"indust","title":"Industrial Technologies","displayCode":"\/Industrial Technologies","attributes":{"classification":"applicationDomain","type":"isApplicableIn"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"brief","title":"Result in Brief","description":"Article: Classic and enhanced","displayCode":"\/Result in Brief","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl,any","uri":"\/docs\/results\/images\/2011-12\/47371.jpg","mimetype":"image\/jpeg","size":"0","copyright":"\u00a9 Shutterstock","contenttype":"webItem","attributes":{"represents":"article","source":"editorial","type":"relatedImage"}}]},"contenttype":"article","attributes":{"source":"editorial","type":"relatedArticle"}},{"availableLanguages":"en","rcn":"3143547","legalName":"INSTYTUT BADAWCZY DROG I MOSTOW, ROAD AND BRIDGE RESEARCH INSTITUTE","address":{"city":"WARSAW","country":"PL"},"relations":{"regions":[{"name":"Poland","rcn":"425101864","nutsCode":"PL","euCode":"PL","isoCode":"PL","attributes":{"type":"relatedRegion"}}]},"contenttype":"organization","attributes":{"source":"cpm","type":"relatedOrganization"}},{"availableLanguages":"en","rcn":"91822","id":"31272","acronym":"ARCHES","title":"Assessment and rehabilitation of Central European highway structures","archivedDate":"2024-06-16 00:00:00","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"project","title":"Project","description":"Project factsheets","displayCode":"\/Project","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/21\/39\/227","title":"physiotherapy","displayCode":"\/medical and health sciences\/clinical medicine\/physiotherapy","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"\/23\/51\/355\/1059","title":"mathematical model","displayCode":"\/natural sciences\/mathematics\/applied mathematics\/mathematical model","attributes":{"classification":"euroSciVoc","type":"isInFieldOfScience"}},{"language":"en","availableLanguages":"en","code":"STREP","title":"Specific Targeted Research Project","displayCode":"\/Specific Targeted Research Project","attributes":{"classification":"projectFundingSchemeCategory","type":"relatedProjectFundingSchemeCategory"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"corda","title":"CORDA","description":"RTD research data warehouse","displayCode":"\/CORDA","attributes":{"classification":"source","type":"isProvidedBy"}}],"associations":[{"availableLanguages":"de,en,es,fr,it","rcn":"715","id":"FP6-SUSTDEV","code":"FP6-SUSTDEV","frameworkProgramme":"FP6","pga":"FP6-SUSTDEV","title":"Sustainable Development, Global Change and Ecosystems: thematic priority 6 under the Focusing and Integrating Community Research programme 2002-2006.","parent":{"rcn":"10880\/10877\/10872\/1400\/670","code":"PRIORITY1\/FOCUS\/SP1\/EC\/FP6"},"archivedDate":"2023-03-27 11:33:43","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"legalbasis","title":"Legal Basis","description":"Programme: Legal basis for research funding","displayCode":"\/Legal Basis","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedLegalBasis"}},{"availableLanguages":"en","rcn":"8529","id":"FP6_SUSTDEV-2005-3.2.2.2.4","code":"SUSTDEV-2005-3.2.2.2.4","frameworkProgramme":"FP6","title":"Research domain 2.2 (only for a new generation of products and systems in waterborne transport), research domain 2.3 (for all types of transport vehicles and vessels excluding passenger cars), research domain 2.4 and research domain 2.6.","parent":{"rcn":"7586\/7388\/7334\/8735\/715\/10880\/10877\/10872\/1400\/670","code":"SUSTDEV-2.1.2\/SUSTDEV-2.1\/SUSTDEV-2\/SUSTDEV\/FP6-SUSTDEV\/PRIORITY1\/FOCUS\/SP1\/EC\/FP6"},"archivedDate":"2023-03-27 11:33:43","relations":{"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"topic","title":"Topic","description":"Programme: Part of the Commission work programme implementing legal basis","displayCode":"\/Topic","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"editorial","title":"CORDIS Editorial","description":"Written by CORDIS","displayCode":"\/CORDIS Editorial","attributes":{"classification":"source","type":"isProvidedBy"}}]},"contenttype":"programme","attributes":{"source":"corda","type":"relatedTopic"}}]},"contenttype":"project","attributes":{"source":"cpm","type":"relatedProject"}},{"language":"en","availableLanguages":"en","uri":"\/docs\/results\/31\/31272\/123652731-6.pdf","title":"Final Report - ARCHES (Assessment and rehabilitation of Central European highway structures)","size":"3925476","description":"This is the final report of the ARCHES project, which aimed to reduce the gap in the standard of highway structures between the Central and Eastern European Countries (CEEC), including New Members States (NMS), and the rest of the EU, in a sustainable way.\n\nThe report begins with an executive summary of objectives and methods for the project, along with the contractors involved. It later describes the major achievements and recommendations as resulted from the project studies and then there is a detailed analysis of the work performed under the various work packages.","contenttype":"webItem","attributes":{"source":"undefined","type":"relatedResultAttachment"}}],"categories":[{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"pubsum","title":"Report Summary","description":"Result: Publishable summary (FP7 SESAM) and Summary for publication (H2020 SyGMa)","displayCode":"\/Report Summary","attributes":{"classification":"collection","type":"belongsTo"}},{"language":"en","availableLanguages":"de,en,es,fr,it,pl","code":"cpm","title":"CPM","description":"RTD project management system (FP6 reports)","displayCode":"\/CPM","attributes":{"classification":"source","type":"isProvidedBy"}}]},"modelVersion":"132","icaVersion":"20.0.0-48f81e07"}