Periodic Reporting for period 1 - MultiCharge (Feasibility Study for the Development of a PFC Harmonic FilterMissing Link for Creation of Simultaneous Multi-Point Fast Charging Stations for Electric Vehicles)
Période du rapport: 2015-03-01 au 2015-08-31
A business plan has been produced detailing the financial, technical and commercial requirements for market access and success. Under the Plan, Carroll & Meynell will be the OEM who will market the product directly to installers, with some marketing to site owners or site operators.
• The ability to rapidly charge up to 10 vehicles simultaneously using 50kw DC
• A capital cost of up to 60% less per vehicle port than the incumbent rapid charging products, with the total cash outlay required from a customer being lower when 4 or more rapid charging ports are required.
• Greater ability to immediately meet user needs by the avoidance of queues
• Provision of all the functionality of incumbent systems, and availability of both CHAdeMO and Combo connectors.