Deliverables
Document automatically generated by the system where each DR event and the PowerCloud response to that event are logged. (Month 18)
CommunicationProject website with a public area to communicate project results and major events. A private area will also be available for the exchange of information between project partners. (Month 12)
Power Consumption baseline reports for each end userDocument detailing power consumption on the selected electronic devices at the end user company before the application of PowerCloud savings plans. (Month 15)
System security reportProduce the system security test document, defining acceptance tests for security. The tests should validate that all calls are done through secure communication channels. (Month 9)
System and Integration test result of PowerCloud version 1.1Document with the acceptance test results. (Month 24)
Power Savings reports for each end userDocument detailing power consumption on the selected electronic devices at the end user company after the application of PowerCloud savings plans. (Month 16)
System acceptance testDocument that records the results of the system acceptance tests. This document should include the stress test results (Month 10)
Acquire the OpenADR certification for PowerCloud system (Month 10)
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available