Skip to main content
European Commission logo print header
Contenu archivé le 2022-11-21

Combined blowing and addition of manganese ore

Objectif

The aim of this project is to explore the possibility of improving the refining in the converter of desiliconized and dephosphorized hot metal. By the addition of manganese ore, it should be possible to improve slag fluidity, to limit fluorspar consumption and to increase the end point manganese content thus reducing ferro-alloy consumption. The work will be conducted in the laboratory and subsequently on an industrial scale in a converter.

Appel à propositions

Data not available

Régime de financement

CSC - Cost-sharing contracts

Coordinateur

CENTRO SVILUPPO MATERIALI SPA
Contribution de l’UE
Aucune donnée
Adresse
Via di Castel Romano 100/102
00128 ROMA EUR
Italie

Voir sur la carte

Coût total
Aucune donnée