Objective This project is intended to develop the Terni installation, which was constructed under contract 7215-CA/402, in order to increase casting capacity and achieve stable casting conditions: 15 tonne ladle, casting time 20-60 minutes. A rolling mill capable of performing in-line thickness reduction of 15%, a coiler and additional instrumentation for casting and rolling control will also be installed. Experimentation will also be carried out into casting stainless steel with dimensions up to 700mm wide and 3mm in thickness. Programme(s) ECSC-STEELDEM 3C - Medium-term guidelines (ECSC) for the programmes of technical steel research and of steel pilot/demonstration projects, 1991-1995 Topic(s) T2 - Continuous casting Call for proposal Data not available Funding Scheme CSC - Cost-sharing contracts Coordinator CENTRO SVILUPPO MATERIALI SPA EU contribution No data Address Via di Castel Romano 100/102 00128 ROMA EUR Italy See on map Total cost No data Participants (1) Sort alphabetically Sort by EU Contribution Expand all Collapse all ILVA Italy EU contribution No data Address Via le B. Brin 218 05100 TERNI See on map Total cost No data