Use of a hydro-pneumatic clearing machine to reduce the physical strain involved in breaking out refractory material in converters

Objectif

Aims of project:

The aim of the project is to reduce the physically demanding work associated with breaking out converters. At present the job is performed by workers using pneumatic drills inside the converters.

The development work will be carried out in the following stages:

Analysis of the current situation
Preparation of a system analysis
Anthropometric studies
Registering and processing of information
Analysis of conceivable incidents
Training of the operators concerned by the project
Study and assessment of the target situation.

Thème(s)

Data not available

Appel à propositions

Data not available

Régime de financement

Data not available

Coordinateur

Klöckner Stahl GmbH
Contribution de l’UE
Aucune donnée
Adresse
Bayreuther Straße 2
92237 Sulzbach-Rosenberg
Allemagne

Voir sur la carte

Coût total
Aucune donnée