CORDIS - Wyniki badań wspieranych przez UE
CORDIS
Zawartość zarchiwizowana w dniu 2019-03-15

INCREASE IN PULPWOOD QUANTITY BY TESTING AND INTRODUCING COST SAVING HARVESTING PROCESSES

Cel



1. PERFORMANCE

2. TEST OBJECT

1.1 MOTOR-MANUAL PROCESS (BENCHING PROCESS) VARIANT: USE OF A CANTILEVER CRANE

1.2 HIGHER-MECHANISED PROCESS'PROCESSOR IN THE FORWARDING LANE' (KOCKUMS GP 822)

1.3 HIGHLY-MECHANISED PROCESS 'PROCESSOR ON THE FORESTRY ROAD'(STEYR STRENAB 45)

3. SCOPE AND DURATION OF TESTS

IN THE FULL-SCALE TEST, THREE PRIMARY CONVERSION GROUPS WILL WORK UP TO 15 MONTHS EACH IN LINE WITH THE AFOREMENTIONED PROCESSES. WITH THE PROCESS UNDER 1.1 (5 FOREST WORKERS), A DEBARKED VOLUME OF 5.000 M3 (S) WILL BE CONVERTED; UNDER 1.2 (5 FOREST WORKERS) A DEBARKED VOLUME OF 8.000 M3 (S); AND UNDER 1.3 (4 FOREST WORKERS) A DEBARKED VOLUME OF 10.000 M3 (S). COMPLETION OF THE ENTIRE TEST (PREPARATION TO FINALISATION, EVALUATION) IS ESTIMATED AT 36 MONTHS.

4. TESTS RESULTS

THE TEST (COVERING 36 MONTHS) IS TO SUPPLY CONCRETE EVIDENCE ON VITAL QUESTIONS FOR THE SELECTED PROCESSES; E.G. RELEVANT TO TIME, EFFICIENCY, TECHNICAL PRODUCTIVITY, COSTS INVESTMENTS, STRUCTURE) OF OPERATION WITH REFERENCE TO UNIT VOLUME, TRAINING REQUIREMENTS, TRAINING PROGRAMME, TRAINING FEES, SURVEYING, WOOD YIELD, MEASURED PURCHASE VOLUME, ORGANIZATION REQUIREMENTS, DETAILED PLANNING FOR THE EXPLOITATION OF THE ENTIRE FOREST GROWTH IN LINE WITH FOREST STRUCTURE, AND CALCULATION ACCORDING TO THE MENG SYSTEM FOR LOGGING DAMAGE. CALCULATED END POINT OF THE TEST IS THE PLACEMENT OF WOOD AT THE FORESTRY ROAD.

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

System finansowania

Data not available

Koordynator

Feldmühle AG
Wkład UE
Brak danych
Adres
Fritz-Vom-Felde-Platz 4
40547 Düsseldorf
Niemcy

Zobacz na mapie

Koszt całkowity
Brak danych