Objectif Demonstration of a 43 % electric efficient 1,4 MWe gas turbine for the supply of heat in a district heating system in Nancy (FR) and the supply of electricity to the national grid in the contract period November - March and moreover to ameliorate the present negative environmental effect of energy from coal and fuel oil. Heat production is variable between 1,0 - 2,5 MWth. The innovations are an electric efficiency of 43%, compared to the 20 - 25% for gas turbines of comparable size and compared to the 38,5% of the THERMIE-supported proof of concept test model. NOx emission level is < 10 ppmv. Two-stage combustion, intercooling, heat recuperation, low temperatures and pressures, all so typical for the cycle, allow for the high electric efficiency, a high lifetime and low maintenance costs. The project saves 560 TOE/ a. The payback time is 10 years in project's 5 month operation and 6 - 7 years in future commercial applications. Champ scientifique engineering and technologymechanical engineeringthermodynamic engineeringengineering and technologyenvironmental engineeringenergy and fuelsfossil energycoal Programme(s) FP5-EESD - Programme for research, technological development and demonstration on "Energy, environment and sustainable development, 1998-2002" Thème(s) 1.1.4.-5.1.3 - More efficient gas turbines Appel à propositions Data not available Régime de financement Data not available Coordinateur SCHELDE HERON B.V. Contribution de l’UE Aucune donnée Adresse Tramsingel 15 4814 AB BREDA Pays-Bas Voir sur la carte Coût total Aucune donnée Participants (3) Trier par ordre alphabétique Trier par contribution de l’UE Tout développer Tout réduire Compagnie Industrielle d'Applications pour les Communications France Contribution de l’UE Aucune donnée Adresse 18 rue Joseph Bara 92130 Issy les Moulineaux Voir sur la carte Coût total Aucune donnée DALKIA France Contribution de l’UE Aucune donnée Adresse 32, Avenue Charles de Gaulle - BP 7 54425 PULNOY Voir sur la carte Coût total Aucune donnée Instituto Superior Technico Portugal Contribution de l’UE Aucune donnée Adresse Av. Rovisco Pais 1049-001 Lisboa Voir sur la carte Coût total Aucune donnée