European Commission logo
English English
CORDIS - EU research results
CORDIS
Content archived on 2022-11-21

Industrial demonstration of hot gas injection at the blast furnace

Objective

This proposal is part of the ULCOS Program and is focused on carbon saving at the blast furnace with an objective of 25%. It aims at testing at a real blast furnace (EKO Stahl BF1) nitrogen-free operation and hot reducing gas injection into the shaft.

The objectives are:
- optimise the gas flow rate injected at the wall and its distribution inside the shaft
- assess the furnace behaviour under these conditions (thermal control, raceway formation, cohesive zone, pressure field, hearth, coke quality damages)
- assess the productivity increase of nitrogen-free operation
- demonstrate high rates of natural gas at the blast furnace.

Topic(s)

Data not available

Call for proposal

Data not available

Funding Scheme

Data not available

Coordinator

ARCELOR RESEARCH S.A.
EU contribution
No data
Address
Immeuble La Pacific
92800 PUTEAUX
France

See on map

Total cost
No data

Participants (9)