Skip to main content
European Commission logo print header
Contenu archivé le 2019-03-05

REFUSE DERIVED FUEL AND/OR MATERIAL RECOVERY FROM REFUSE.

Objectif



THE PROJECT IS DIVIDED INTO THREE PARTS.
PART I INCLUDES STUDIES OF MATERIAL RECOVERY AND AN INVENTORY AND EVALUATION OF WASTE SORTING EQUIPMENT AND SYSTEM FOR RDF PRODUCTION, FIBRE AND PLASTIC RECOVERY.
PRACTICAL EXPERIMENTS CONNECTED TO THIS PART SUCH AS QUANTITY AND COMPOSITION, SIZE REDUCTION OF REFUSE, STORAGE OF WASTE DERIVED MATERIALS ARE DESCRIBED IN PART II.
A MODEL FOR A COMPLETE RECOVERY SYSTEM FOR A REGION IN THE 1990'S WILL BE PRESENTED IN PART III.

Thème(s)

Data not available

Appel à propositions

Data not available

Régime de financement

Data not available

Coordinateur

K-KONSULT
Contribution de l’UE
Aucune donnée
Adresse
LILJEHOLMSTORGET 7
80 STOCKHOLM
Suède

Voir sur la carte

Coût total
Aucune donnée