Cel This project envisaged the field testing of a down-hole steam generator developed in project no TH 05015/80.Works on this project have been preliminary: site preparation only .The project pursued the laboratory development of downhole steam generator to include a realistic evaluation in a downhole environment. It was carried out in a single stage which comprises the field evaluation of a 5 MW (5000 BBL steam/day) steam generator at depths up to 400 m in a non producing test well of the Egmanton field. Program(-y) ENG-HYDROCARB 1C - Programme (EEC) of Community projects in the hydrocarbons sector, 1973-1985 Temat(-y) 1.5 - IMPROVED OIL RECOVERY Zaproszenie do składania wniosków Data not available System finansowania DEM - Demonstration contracts Koordynator British Petroleum plc (BP) Wkład UE Brak danych Adres Britannic House Moor Lane EC24 9BU London Zjednoczone Królestwo Zobacz na mapie Koszt całkowity Brak danych