Obiettivo To install a 1.8 MW wind farm consisting of six 300 kW turbines on a remote island location, without conventional crane erection techniques. To demonstrate diesel fuel savings for the existing diesel generation facility. To build on the experiences of the 2.7 Dunkerque wind farm project by continuing the development of the Francisation of the WindMaster 300 kW turbine, by successful integration of French manufactured components. Redesign of existing turbine technology to facilitate shipment by means of standard containers i.e. a self-contained unit for application in remote regions. Design and implementation of self erection technology for application in remote regions. Delivery of advanced control and inverter technology for wind-diesel hybrid systems for application in remote regions. Campo scientifico engineering and technologyenvironmental engineeringenergy and fuelsliquid fuels Programma(i) FP4-NNE-THERMIE C - Specific programme for research and technological development, including demonstration in the field of non-nuclear energy, 1994-1998 Argomento(i) 7 - WIND ENERGY Invito a presentare proposte Data not available Meccanismo di finanziamento DEM - Demonstration contracts Coordinatore WINDMASTER NEDERLAND BV Contributo UE Nessun dato Indirizzo ZUIVERINGSWEG 26 8243 PZ LELYSTAD Paesi Bassi Mostra sulla mappa Costo totale Nessun dato