Skip to main content
European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS
Contenido archivado el 2022-12-27

COLUMN FLOTATION OF COPPER AND ZINC ORE OF THE CHESSY MINE, FRANCE

Objetivo

Electricity saving and concentration increase in the roughing (first beneficiation step) of CU-ZN processing. In a new mine to be opened, traditional, two steps, mechanically stirred, flotation cells will be replaced by a single flotation column (one for ZN and one for CU). Production planned: 300000 t/y of concentrate. Energy consumption: 4.6 kWh/t instead of 11.2 kWh/t annual saving 2000 MWh. Grade of concentrate is improved. Investment cost is a bit lower than traditional process but overcost results for the project from progressive start up due to new technology. Same operating costs except transportation cost which is reduced.

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

SOCIETE MINIERE DE CHESSY
Aportación de la UE
Sin datos
Dirección
LIEU-DIT "LES MINES"
69380 CHESSY LES MINES
Francia

Ver en el mapa

Coste total
Sin datos