Cel To disseminate the WTGs in Puglia through the realization of 5 AIT 02 MK2 wind farm with 1600 kW of total electric power.This wind farm is composed of 5 AIT 02 MK2 WTGs with 320 kW each, for a total installed power of 1600 kW. From Enel grid to each WTGs there are the following main components : * Box of electric station MT/MT (medium voltage/medium voltage)* Connection MT lines between station MT/MT and the WGTs boxes* Boxes MT/BT (medium voltage/now voltage) placed near the WGTGs (one box per each WTG)* Connection BT line between box MT/BT and WTG* Moreover the wind farm includes as subsystem :* Meaurement, Control, Monitoring station* Anemometric - Meteorologic plantThe producibility of such a wind farm essentially depends on the site anemologic characteristics, that is on wind annual mean velocity and on site height above sea level.Assuming at hub height (26 m from ground) an annual mean velocity 8.4 m/s (value found out by preliminary analyses in Roseto Valfortore area) this wind farm, with 100% availability, will produce 5.060.00 kWh in steady conditions. Program(-y) ENG-THERMIE 1 - Programme (EEC) for the promotion of energy technology in Europe (THERMIE), 1990-1994 Temat(-y) Data not available Zaproszenie do składania wniosków Data not available System finansowania DEM - Demonstration contracts Koordynator Wind Energy System Taranto Alenia SpA West Wkład UE Brak danych Adres Via Ariosto 12 Zona Industriale 74100 Taranto Włochy Zobacz na mapie Koszt całkowity Brak danych