Skip to main content
European Commission logo print header

Tauernwindpark Oberzeiring - Wind Energy at Alpine Site with Severe Weather Conditions

Obiettivo

A. Development of special transportation means for turbine erection on alpine sites;
B. Annual production of 29 GWh electricity as a contribution to the new Austrian electricity laws and to the EU White Paper and Kyoto goals;
C. Improvement of wind turbine availability on alpine sites up to 95%;
D. Increasing turbine energy output under severe icing up to 15% by the optimal use of a blade heating system;
E. Improvement of anemometers and ice detectors for wind prediction and in monitoring turbines under low temperatures and icing;
F. Optimization of the power curve of wind turbines at a tsite with variable air density and turbulent air currents;
G. Measurements and analysis of the ice accumulation effects on the loads, performance and life span of the wind turbines.

Invito a presentare proposte

Data not available

Meccanismo di finanziamento

Data not available

Coordinatore

Energiewerkstatt GmbH
Contributo UE
Nessun dato
Indirizzo
Heiligenstatt 24
5211 Friedburg
Austria

Mostra sulla mappa

Costo totale
Nessun dato

Partecipanti (6)