Skip to main content
European Commission logo print header
Contenido archivado el 2022-11-21

Valorisation of ferrous waste by INMETCO process

Objetivo

It is proposed to undertake a detailed engineering study of the capability of the INMETCO process for the treatment of steel plant wastes. The work will cover technical and economic aspects of the process as well as an assessment of the risks involved. This project will be undertaken in close collaboration with a parallel study to be conducted by VDEh (7215-BA/104).

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

EISENHÜTTE SÜDWEST
Aportación de la UE
Sin datos
Dirección
Franz-Josef-Röder-Strasse,9
66119 SAARBRÜCKEN
Alemania

Ver en el mapa

Coste total
Sin datos