Skip to main content
European Commission logo print header
Zawartość zarchiwizowana w dniu 2022-11-21

Industrial demonstration of hot gas injection at the blast furnace

Cel

This proposal is part of the ULCOS Program and is focused on carbon saving at the blast furnace with an objective of 25%. It aims at testing at a real blast furnace (EKO Stahl BF1) nitrogen-free operation and hot reducing gas injection into the shaft.

The objectives are:
- optimise the gas flow rate injected at the wall and its distribution inside the shaft
- assess the furnace behaviour under these conditions (thermal control, raceway formation, cohesive zone, pressure field, hearth, coke quality damages)
- assess the productivity increase of nitrogen-free operation
- demonstrate high rates of natural gas at the blast furnace.

Temat(-y)

Data not available

Zaproszenie do składania wniosków

Data not available

System finansowania

Data not available

Koordynator

ARCELOR RESEARCH S.A.
Wkład UE
Brak danych
Adres
Immeuble La Pacific
92800 PUTEAUX
Francja

Zobacz na mapie

Koszt całkowity
Brak danych

Uczestnicy (9)