Objetivo The aim is to demonstrate an integrated waste material recovery plant, thereby reducing significantly the need for landfill.The plant integrates collection and disposal enabling the plant to operate at full capacity for a minimum number of hours per day. It accepts 200 T/day of municipal and industrial waste of which 120 T/day is to be recovered as useful by-products in the form of RDF (15,800 T/y); compost (13,400 T/y); ferrous metal (3,500 T/y); paper (3,700 T/y) and plastic (1,000 T/y).The thermal value of the combustible fraction is estimated to be 150 MWh/y, 46% of which is provided by the RDF which is currently used as fuel in a brick-kiln.The plant serves a population of 140,000 reducing the volume of waste going to landfill by 87%. The residues from the plant are landfilled, however, they are largely inert and therefore cause few environmental problems.The reduced volume of waste going to landfill also significantly reduces the transport costs of the disposal operation. Programa(s) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Tema(s) 1.6 - TREATMENT OF WASTE Convocatoria de propuestas Data not available Régimen de financiación DEM - Demonstration contracts Coordinador Snua Srl Aportación de la UE Sin datos Dirección Viale Treviso 54 33170 San Quirino Pordenone Italia Ver en el mapa Coste total Sin datos