Cel The objective of COMPLAN is to develop an integrated system for concurrent process planning, scheduling and shop-floor control based on non-linear plans (ie process plans containing manufacturing alternatives) for small-batch manufacture of mechanical parts.The following modules will form the COMPLAN system: - a process planning oriented CAD/CAPP Programming Interface will provide the required direct coupling to a wide variety of CAD-systems and provide technical and geometric information - an existing semi-automatic process planning system (running in 40 companies) and an existing expert shell for automatic process planning of a limited workpiece spectrum (EP 2457) will be adapted and merged to form a single planning environment allowing the generation of non-linear process plans. It will be integrated with a graphical editor for non-linear process plans (EP 2457) - a process plan evaluator which will allow the process planning module to consider both actual and forecasted workshop loading information during the generation of non-linear process plans and during just-in-time process planning. Furthermore it allows manufacturing alternatives to be assessed with respect to times, costs, and technical validity - a workshop control system, based on non-linear process plans will be integrated with the process planning system - a production evaluator evaluates the quality of a schedule and determines the workshop performance in the past. The evaluation results will support and control both process planning and scheduling. A pilot demonstration and evaluation are foreseen by a machine tool company (LVD) acting as a pilot end-user. The results will be incorporated in products marketed by vendor consortium members. Dziedzina nauki engineering and technologyelectrical engineering, electronic engineering, information engineeringelectronic engineeringcontrol systems Program(-y) FP3-ESPRIT 3 - Specific research and technological development programme (EEC) in the field of information technologies, 1990-1994 Temat(-y) Data not available Zaproszenie do składania wniosków Data not available System finansowania Data not available Koordynator INSTITUT FÜR INTEGRIERTE PRODUKTION HANNOVER GMBH Wkład UE Brak danych Adres LANGE LAUBE 13 30159 HANNOVER Niemcy Zobacz na mapie Koszt całkowity Brak danych Uczestnicy (6) Sortuj alfabetycznie Sortuj według wkładu UE Rozwiń wszystko Zwiń wszystko ADVANCED INFORMATION SYSTEMS N.V. Belgia Wkład UE Brak danych Adres AVENUE JOSEPH WYBRAN, 40 1070 BRUXELLES Zobacz na mapie Koszt całkowity Brak danych CRIF MECHANICAL ENGINEERING Belgia Wkład UE Brak danych Adres CELESTIJNENLAAN, 300C 3001 HEVERLEE Zobacz na mapie Koszt całkowity Brak danych Competence Center Informatik GmbH Niemcy Wkład UE Brak danych Adres Lohberg 10 49716 Meppen Zobacz na mapie Koszt całkowity Brak danych KATHOLIEKE UNIVERSITEIT LEUVEN Belgia Wkład UE Brak danych Adres BENEDENSTRAAT, 59 3000 LEUVEN Zobacz na mapie Koszt całkowity Brak danych LVD COMPANY Belgia Wkład UE Brak danych Adres NIJVERHEIDSLAAN, 2 8630 WEVELGEM Zobacz na mapie Koszt całkowity Brak danych Universität Hannover Niemcy Wkład UE Brak danych Adres Nienburger Straße 17 30167 Hannover Zobacz na mapie Koszt całkowity Brak danych