Objetivo The objective of COMPLAN is to develop an integrated system for concurrent process planning, scheduling and shop-floor control based on non-linear plans (ie process plans containing manufacturing alternatives) for small-batch manufacture of mechanical parts.The following modules will form the COMPLAN system: - a process planning oriented CAD/CAPP Programming Interface will provide the required direct coupling to a wide variety of CAD-systems and provide technical and geometric information - an existing semi-automatic process planning system (running in 40 companies) and an existing expert shell for automatic process planning of a limited workpiece spectrum (EP 2457) will be adapted and merged to form a single planning environment allowing the generation of non-linear process plans. It will be integrated with a graphical editor for non-linear process plans (EP 2457) - a process plan evaluator which will allow the process planning module to consider both actual and forecasted workshop loading information during the generation of non-linear process plans and during just-in-time process planning. Furthermore it allows manufacturing alternatives to be assessed with respect to times, costs, and technical validity - a workshop control system, based on non-linear process plans will be integrated with the process planning system - a production evaluator evaluates the quality of a schedule and determines the workshop performance in the past. The evaluation results will support and control both process planning and scheduling. A pilot demonstration and evaluation are foreseen by a machine tool company (LVD) acting as a pilot end-user. The results will be incorporated in products marketed by vendor consortium members. Ámbito científico engineering and technologyelectrical engineering, electronic engineering, information engineeringelectronic engineeringcontrol systems Programa(s) FP3-ESPRIT 3 - Specific research and technological development programme (EEC) in the field of information technologies, 1990-1994 Tema(s) Data not available Convocatoria de propuestas Data not available Régimen de financiación Data not available Coordinador INSTITUT FÜR INTEGRIERTE PRODUKTION HANNOVER GMBH Aportación de la UE Sin datos Dirección LANGE LAUBE 13 30159 HANNOVER Alemania Ver en el mapa Coste total Sin datos Participantes (6) Ordenar alfabéticamente Ordenar por aportación de la UE Ampliar todo Contraer todo ADVANCED INFORMATION SYSTEMS N.V. Bélgica Aportación de la UE Sin datos Dirección AVENUE JOSEPH WYBRAN, 40 1070 BRUXELLES Ver en el mapa Coste total Sin datos CRIF MECHANICAL ENGINEERING Bélgica Aportación de la UE Sin datos Dirección CELESTIJNENLAAN, 300C 3001 HEVERLEE Ver en el mapa Coste total Sin datos Competence Center Informatik GmbH Alemania Aportación de la UE Sin datos Dirección Lohberg 10 49716 Meppen Ver en el mapa Coste total Sin datos KATHOLIEKE UNIVERSITEIT LEUVEN Bélgica Aportación de la UE Sin datos Dirección BENEDENSTRAAT, 59 3000 LEUVEN Ver en el mapa Coste total Sin datos LVD COMPANY Bélgica Aportación de la UE Sin datos Dirección NIJVERHEIDSLAAN, 2 8630 WEVELGEM Ver en el mapa Coste total Sin datos Universität Hannover Alemania Aportación de la UE Sin datos Dirección Nienburger Straße 17 30167 Hannover Ver en el mapa Coste total Sin datos