Objectif The project aims at developing a recycling route for the various metallurgical wastes that would require no or limited pre-treatment steps of waste materials before processing. The production of a pre-reduced and agglomerated material strong enough to be readily charged to existing melting units such as BF, cupola furnace, EAF or SAF for the recovery of its iron content and recovering high time and lead metals as a separate saleable by-product are further aims. Pre-processing of wastes using the COMET direct reduction process will allow fulfilling all the objectives of the project. The results of this project will minimise the cost of wastes treatment and recycling and also will reduce the amount of waste materials to be dumped. Programme(s) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Thème(s) B - Reduction of iron ores Appel à propositions Data not available Régime de financement CSC - Cost-sharing contracts Coordinateur CENTRE DE RECHERCHES METALLURGIQUES Contribution de l’UE Aucune donnée Adresse Rue Ernest Solvay, 11 4000 LIEGE Belgique Voir sur la carte Coût total Aucune donnée Participants (2) Trier par ordre alphabétique Trier par contribution de l’UE Tout développer Tout réduire INSTITUT DE RECHERCHES DE LA SIDERURGIE FRANÇAISE France Contribution de l’UE Aucune donnée Adresse Immeuble "PACIFIC", La Défense 7 11/13 Cours Valmy 92800 PUTEAUX Voir sur la carte Coût total Aucune donnée THYSSEN KRUPP STAHL Allemagne Contribution de l’UE Aucune donnée Adresse Kaiser-Wilhelmstrasse 100 47166 DUISBURG Voir sur la carte Coût total Aucune donnée