Objetivo The project aims at developing a recycling route for the various metallurgical wastes that would require no or limited pre-treatment steps of waste materials before processing. The production of a pre-reduced and agglomerated material strong enough to be readily charged to existing melting units such as BF, cupola furnace, EAF or SAF for the recovery of its iron content and recovering high time and lead metals as a separate saleable by-product are further aims. Pre-processing of wastes using the COMET direct reduction process will allow fulfilling all the objectives of the project. The results of this project will minimise the cost of wastes treatment and recycling and also will reduce the amount of waste materials to be dumped. Programa(s) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Tema(s) B - Reduction of iron ores Convocatoria de propuestas Data not available Régimen de financiación CSC - Cost-sharing contracts Coordinador CENTRE DE RECHERCHES METALLURGIQUES Aportación de la UE Sin datos Dirección Rue Ernest Solvay, 11 4000 LIEGE Bélgica Ver en el mapa Coste total Sin datos Participantes (2) Ordenar alfabéticamente Ordenar por aportación de la UE Ampliar todo Contraer todo INSTITUT DE RECHERCHES DE LA SIDERURGIE FRANÇAISE Francia Aportación de la UE Sin datos Dirección Immeuble "PACIFIC", La Défense 7 11/13 Cours Valmy 92800 PUTEAUX Ver en el mapa Coste total Sin datos THYSSEN KRUPP STAHL Alemania Aportación de la UE Sin datos Dirección Kaiser-Wilhelmstrasse 100 47166 DUISBURG Ver en el mapa Coste total Sin datos