Development of a shaft furnace pilot plant (1st phase)

Objectif

The aim of the project is to develop and operate, on an industrial scale, a new-design electric arc furnace with an attached shaft for continuous scrap loading and scrap preheating. The hot waste gases from the furnace will be sucked through the scrap column of the pre-heater shaft where they will be cooled down. The dust contained in the waste gases will be partially trapped by the scrap column. The material to be melted will continuously flow from the shaft into the furnace hearth. The main aim is to assess the feasibility of reducing energy consumption, shortening melting-time, reducing electrode consumption and noise level as well as of using wet and contaminated scrap.

Appel à propositions

Data not available

Régime de financement

DEM - Demonstration contracts

Coordinateur

DET DANSKE STÅLVALSEVÆRK
Contribution de l’UE
Aucune donnée
Adresse

3300 FREDERIKSVÆRK
Danemark

Voir sur la carte

Coût total
Aucune donnée

Participants (1)