Obiettivo The aim of the project is to develop and operate, on an industrial scale, a new-design electric arc furnace with an attached shaft for continuous scrap loading and scrap preheating. The hot waste gases from the furnace will be sucked through the scrap column of the pre-heater shaft where they will be cooled down. The dust contained in the waste gases will be partially trapped by the scrap column. The material to be melted will continuously flow from the shaft into the furnace hearth. The main aim is to assess the feasibility of reducing energy consumption, shortening melting-time, reducing electrode consumption and noise level as well as of using wet and contaminated scrap. Programma(i) ECSC-STEELDEM 2C - Programme (ECSC) "pilot and demonstration projects in the iron and steel industry", 1988-1992 Argomento(i) T1 - Iron and steelmaking Invito a presentare proposte Data not available Meccanismo di finanziamento DEM - Demonstration contracts Coordinatore DET DANSKE STÅLVALSEVÆRK Contributo UE Nessun dato Indirizzo 3300 FREDERIKSVÆRK Danimarca Mostra sulla mappa Costo totale Nessun dato Partecipanti (1) Classifica in ordine alfabetico Classifica per Contributo UE Espandi tutto Riduci tutto FUCHS SYSTEM TECHNIK Germania Contributo UE Nessun dato Indirizzo Reithallenstrasse 1 77731 WILLSTÄTT-LEGELSHURST Mostra sulla mappa Costo totale Nessun dato