Skip to main content
European Commission logo print header
Contenuto archiviato il 2022-11-21

Development of a shaft furnace pilot plant (1st phase)

Obiettivo

The aim of the project is to develop and operate, on an industrial scale, a new-design electric arc furnace with an attached shaft for continuous scrap loading and scrap preheating. The hot waste gases from the furnace will be sucked through the scrap column of the pre-heater shaft where they will be cooled down. The dust contained in the waste gases will be partially trapped by the scrap column. The material to be melted will continuously flow from the shaft into the furnace hearth. The main aim is to assess the feasibility of reducing energy consumption, shortening melting-time, reducing electrode consumption and noise level as well as of using wet and contaminated scrap.

Invito a presentare proposte

Data not available

Meccanismo di finanziamento

DEM - Demonstration contracts

Coordinatore

DET DANSKE STÅLVALSEVÆRK
Contributo UE
Nessun dato
Indirizzo

3300 FREDERIKSVÆRK
Danimarca

Mostra sulla mappa

Costo totale
Nessun dato

Partecipanti (1)