Cel In a previous ECSC-funded research project, the performances of a high- temperature metallic filter were investigated at a very small scale. The system was installed on a production plant and was shown to be capable of achieving outlet particulate concentrations of less than 10 mg/Nm3. Trace organic emissions were also reduced by injection of carbon-based adsorbents into the waste gas stream. The proposal is to build a larger scale plant and to install it on an operational sinter strand to further evaluate the performance of the filter under the conditions of continuous operation. Program(-y) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Temat(-y) T1 - Iron and steelmaking Zaproszenie do składania wniosków Data not available System finansowania CSC - Cost-sharing contracts Koordynator CORUS UK LIMITED Wkład UE Brak danych Adres 15 Great Marlborough Street W1F 7AS LONDON Zjednoczone Królestwo Zobacz na mapie Koszt całkowity Brak danych