Cel To date 25 research groups from 9 EU Member States, comprising 70 scientists in total, have worked for 582 station days at Hasylab. The first part of the Large Installations Plan coincided with reconstructing DORIS. This provided seven new wiggler and undulator beamlines, two of which, a general purpose goniometer and an ultra-small angle X-ray scattering measuring instrument were constructed with support from the Large Installations Plan. The resulting research covered a variety of topics in the fields of photoelectron spectroscopy, crystallography, small angle X-ray scattering, surface X-ray diffraction under grazing incidence, X-ray topography and X-ray absorption spectroscopy. Some 40 visiting EU research groups plan to use the facility at a later stage. Dziedzina nauki natural sciencesearth and related environmental sciencesgeologymineralogycrystallographynatural sciencesphysical sciencesastronomyplanetary sciencesplanetary geologynatural sciencesphysical sciencesopticsspectroscopyabsorption spectroscopy Program(-y) FP2-SCIFAC C - Plan (EEC) to support and facilitate access to large-scale scientific facilities of European interest, 1989-1992 Temat(-y) Data not available Zaproszenie do składania wniosków Data not available System finansowania CSC - Cost-sharing contracts Koordynator STIFTUNG DEUTSCHES ELEKTRONEN-SYNCHROTRON DESY Wkład UE Brak danych Adres NOTKESTRASSE 85 HAMBURG Niemcy Zobacz na mapie Linki Strona internetowa Opens in new window Koszt całkowity Brak danych