Objectif Construction of ten 2-family dwellings (100 m2 each) using passive and active solar energy for heating, climatization and DHW.The building facades serve as collectors by means of transparent and insulating cladding panels ('legis').The payback of this current project will be 26 years, however in future this should decrease to 5-7 years once the technology is commercially available.Expected energy production is 150 MWh/yr.The main part of a LEGIS-wall is the transparent insulation material with high transmission and low heatflow. In use in front a facade, combined with a roller blind, a wall heating system is created. If a pipe system is added on the facade an active water heating system for low temperature heating devices is formed. The LEGIS-wall with controlled roller blinds is newly developed but not yet proven in larger scale applications. Programme(s) ENG-ENDEMO C - Programme (EEC) of demonstration projects and industrial pilot projects (EEC) in the energy field, 1985-1989 Thème(s) 7.2 - THERMAL Appel à propositions Data not available Régime de financement DEM - Demonstration contracts Coordinateur NORBERT KAISER CONSULTING AND CONTROLLING Contribution de l’UE Aucune donnée Adresse INGENIEURBUERO FUER BAUWESEN MARSCHALLSTRASSE 30 4000 Dusseldorf Allemagne Voir sur la carte Coût total Aucune donnée