Objetivo The major objective of this research project is to develop a control algorithm to optimise the input of electrical energy to the three-phase electric arc furnace (EAF). This algorithm will use plant data signals, which will be collected and analysed in real time. The control algorithm will be derived from a thermal model of the furnace, from analysing extended data of the furnace and from process knowledge of EAF operators. Results are expected to be applicable to any three-phase electric arc furnace equipped with modern electrode regulators. Programa(s) ECSC-STEEL C - Medium-term guidelines for the ECSC steel RTD programme of research and pilot/demonstration projects, 1996-2002 Tema(s) C1 - Primary steelmaking Convocatoria de propuestas Data not available Régimen de financiación CSC - Cost-sharing contracts Coordinador INSTITUT FÜR BERGWERKS- UND HÜTTENMASCHINENKUNDE DER RWTH AACHEN Aportación de la UE Sin datos Dirección Wüllnerstrasse, 2 52056 AACHEN Alemania Ver en el mapa Coste total Sin datos Participantes (3) Ordenar alfabéticamente Ordenar por aportación de la UE Ampliar todo Contraer todo British Steel plc Reino Unido Aportación de la UE Sin datos Dirección Moorgate S60 3AR Rotherham Ver en el mapa Coste total Sin datos SIDENOR I+D España Aportación de la UE Sin datos Dirección Barrio Ugarte s/n 48970 BASAURI (VIZCAYA) Ver en el mapa Coste total Sin datos XPERT Alemania Aportación de la UE Sin datos Dirección 14746 BRANDENBURG Ver en el mapa Coste total Sin datos